VMP-IOMM-2018-2
Fulton Ltd
Page 15
INSTALLATION - 2
2.6
ELECTRICAL REQUIREMENTS
CAUTION
Any electrical work should be undertaken by a qualified electrician to current local regulations.
!
An individual wiring diagram for the boiler is located on the inside cover of the control box.
Make sure the information on the electrical drawing corresponds to your voltage and frequency.
Check the supply voltage and make sure that there is no over-or under-voltage exceeding 10% of
the nominal value.
When referring to the electrical specification of the boiler, the reference number located on the
rear inside wall of the control box and the wiring diagram number should be quoted.
Unless otherwise specified, the alarms supplied will be mains voltage models. Unless otherwise
specified all models are supplied with burner motors and feedwater pump motors arranged for
operation on a three phase supply.
A wall-mounted, fused disconnect sized for the unit must be provided and fitted by the client/
contractor, if disconnect is not supplied on the panel.
Connect power to the terminal strip as supplied on the inside of the panel box.
Note:
Single skid systems are generally shipped completely pre-wired.
Note:
The power ratings and requirements are given in Appendix A - TI-128-VMP Series Dimensions & Specification.
Note:
It is advisable for dual fuel burners, that the offline fuel is manually isolated with a proof of closure
microswitch that is interlocked with the online control circuit.
e.g. gas supply proof of closure interlocked with the oil burner control circuit. Oil supply proof of closure
interlocked with the gas burner control circuit.
WARNING
Assure all electrical connections are powered down prior to attempting replacement or service of electrical
components or connections of the equipment.
!
2.6.1
ELECTRICAL CUSTOMER CONNECTIONS
Feed Pump
Boiler feedwater pump to maintain water level in boiler.
Gas Booster
To boost the gas supply to boiler if mains pressure is not adequate.
Gas / Oil Indicator
A volt free contact is provided to give remote indication of which fuel the boiler is running on for
dual fuel boilers.
Oil Valve Interlock
Provision for an oil valve contact to prevent an oil supply to boiler when running on gas. Not
supplied by Fulton.
If not used terminals must be linked.
Содержание VMP Series
Страница 8: ...VMP IOMM 2018 2 Fulton Ltd Page VIII...
Страница 25: ...VMP IOMM 2018 2 Fulton Ltd Page 17 INSTALLATION 2 Figure 10 Electrical Customer Terminal Connections...
Страница 30: ...VMP IOMM 2018 2 Fulton Ltd Page 22...
Страница 66: ...VMP IOMM 2018 2 Fulton Ltd Page 58...
Страница 100: ...VMP IOMM 2018 2 Fulton Ltd Page 92...
Страница 102: ...VMP IOMM 2018 2 Fulton Ltd Page 94 APPENDIX C...