Daily Check
●
Daily Check Procedure
No. Check Item
Check Procedure
Criteria
1
External Appearance, Accessories
01
External Appearance Visually check the exterior for
scratches, cracks, deformation, and
rust.
No scratches, cracks,
deformation, and rust
should be found on the
exterior.
Check whether the equipment is
installed on a level surface.
The unit should be levelled
and stable.
02 Installation
Check whether the equipment is
installed in a place susceptible to
adverse environment.
The environmental
condition (e.g. temperature,
humidity) of the installed
place should be as
specified. The equipment
should not be subjected to
splashing water.
03
Cables
Check that neither damage nor broken
wire is found in all cables.
Neither damage nor broken
wire should be found.
04
Periodic Check
Check the date of the previous periodic
inspection.
Should be within 1 year.
No. Check Item
Check Procedure
Criteria
2
Operation
01
Function
Turn ON the power of the monitor, and
check that it functions properly.
or
indicator should light in
green.
12
-
3
Содержание HR-800
Страница 4: ...Blank Page ...
Страница 12: ...viii Blank Page ...
Страница 16: ...xii Blank Page ...
Страница 17: ...1 1 General Description Chapter 1 HR 800 Recorder Module 1 2 HR 800 Recorder Module General Description 1 2 ...
Страница 19: ...Specification Chapter 2 HR 800 Recorder Module 2 2 HR 800 Recorder Module Specification 2 2 2 1 ...
Страница 26: ...3 4 Blank Page ...
Страница 37: ...Wiring Diagram Block Diagram of the Recorder Unit 5 3 ...
Страница 41: ...7 1 Assembly Diagram Chapter 7 HR 800 Assembly1 HR 800 01A 7 2 HR 800 Assembly2 HR 800 02A 7 3 ...
Страница 42: ...7 2 HR 800 Assembly1 HR 800 01A ...
Страница 43: ...7 3 HR 800 Assembly2 HR 800 02A ...
Страница 44: ...7 4 Blank Page ...
Страница 47: ...Caution Label Chapter 9 Caution Label 9 2 HR 800 9 2 9 1 ...
Страница 48: ...Caution Label HR 800 HR 800 9 2 ...
Страница 52: ...10 4 Blank Page ...
Страница 68: ...12 6 Blank Page ...