NIBP Maintenance
Before conducting a test, connect a 500cc tank to the cuff hose.
●
Pressure Inspection
1. Select "NIBP Maintenance" under the "Maintenance" menu.
2. Select "Pressure Inspection" when the "NIBP Maintenance" window is displayed.
3. Select "Pressure Inspection" when the "Pressure Inspection" window is displayed.
9
-
5
Содержание DSL-8001
Страница 4: ...Blank Page ...
Страница 39: ...2 1 Specification Chapter 2 Specification Performance 2 2 Specification 2 2 Performance 2 3 ...
Страница 44: ...2 6 Blank Page ...
Страница 60: ...3 16 Blank Page ...
Страница 61: ...Wiring Diagram Chapter 4 Block Wiring Diagram 4 2 4 1 ...
Страница 62: ...Block Wiring Diagram This section describes the block wiring diagram of the DSL 8001 Block Wiring Diagram 4 2 ...
Страница 64: ...4 4 Blank Page ...
Страница 72: ...6 6 Blank Page ...
Страница 102: ...7 30 Blank Page ...
Страница 148: ...11 6 Blank Page ...
Страница 150: ...3 39 4 Hongo Bunkyo ku Tokyo Japan Phone 81 3 3815 2121 Fax 81 3 3814 1222 Printed in Japan 4R0100780 201301 ...