02-10
2-5-3 Defrost Operation Control
Accumulated heating operation time is 40 minutes or longer
[Accumulated heating operation time is reset at the end of cooling operation or defrosting operation.]
and
an outdoor unit satisfies condition or below
Condition : "Heat exchange temperature -2°C" accumulated operating time is 180 minutes or longer
Condition : After the following all condition satisfied, "heat exchange temperature defrosting start judgment
temperature and during heat exchange liquid temperature drop" accumulated time:10minutes
(a) accumulated heating operation time 30 minutes
(b) 10 minutes have elapsed after outdoor unit starting
(c) 5 minutes have elapsed since oil recovery
* Defrosting start and end judgment temperature are determined by the outdoor temperature.
Defrosting start judgment temperature = 0.8 x outdoor temperature - 11.6 (However, -27.6°C to
- 6°C)
At all outdoor units, heat exchange liquid temperature end judgment temperature
or
when 10 minutes have elapsed from the start
(When the indoor unit connection capacity is 90% or less, after 15 minutes have elapsed.)
Defrosting end judgment temperature = 0.39 x outdoor tempe 12.7 (However, 5 to 12°C range)
If the calculated result is lower tha
n -27.6 , the judgment temperature is defined as -27.6
If the calculated result is higher tha
n -6 , the judgment temperature is defined as -6
2-5-2 Pre-heat Operation
This pre-heat operation protects the start up failure by preventing the refrigerant from soaking into the oil in compressor.
Crankcase heater ON: 30 minutes elapsed since installed compressors stopped (However, ON when power turned on)
*It doesn't control according to the temperature.
If the calculated result is lower tha
n 5 , the judgment temperature is defined as 5
If the calculated result is higher tha
n 12 , the judgment temperature is defined as 12
OFF: Compressor starts
Outdoor temperature <2 and Compressor stop count exceed 20 times at less than 10 minutes of accumulated
heating operation time
Defrost Operation Start Condition 1
Defrost Operation Start Condition 2
Defrost Operation End Condition
Содержание Airstage J-II
Страница 1: ...Small VRF system for light commercial and home use SERVICE MANUAL ...
Страница 2: ......
Страница 6: ......
Страница 7: ...1 TEST RUN ...
Страница 8: ......
Страница 27: ...2 OUTDOOR UNIT OPERATION CONTROL ...
Страница 28: ......
Страница 42: ......
Страница 43: ...3 INDOOR UNIT OPERATION ...
Страница 44: ......
Страница 63: ...4 TROUBLE SHOOTING ...
Страница 73: ......
Страница 170: ......
Страница 171: ...5 APPENDING DATA UNIT ...
Страница 172: ......
Страница 174: ...MODELS AUXB07 AUXB09 AUXB12 AUXB14 AUXB18 AUXB24 05 02 5 2 WIRING DIAGRAM 5 2 1 Indoor Unit ...
Страница 175: ...MODELS AUXD18 AUXD24 AUXA30 AUXA36 AUXA45 AUXA54 05 03 ...
Страница 176: ...MODELS ARXB07 ARXB09 ARXB12 ARXB14 ARXB18 05 04 ...
Страница 177: ...MODEL ARXB24 MODELS ARXB30 ARXB36 05 05 ...
Страница 178: ...MODEL ARXB45 05 06 ...
Страница 179: ...MODEL ARXA24 MODELS ARXA30 ARXA36 ARXA45 05 07 ...
Страница 180: ...MODELS ARXC36 ARXC45 ARXC60 MODELS ARXC72 ARXC90 05 08 ...
Страница 181: ...MODELS ARXD07 ARXD09 ARXD12 ARXD14 ARXD18 ARXD24 05 09 ...
Страница 182: ...MODELS AB A12 AB A14 AB A18 AB A24 05 10 ...
Страница 183: ...MODELS AB A12LBTH AB A14LBTH 05 11 AB A18LBTH AB A24LBTH ...
Страница 184: ...05 12 MODELS AB A30 AB A36 AB A45 AB A54 ...
Страница 185: ...05 13 MODELS AB A30LBTH AB A36LBTH AB A45LBTH AB A54LBTH ...
Страница 186: ...MODELS AS A07 AS A09 AS A12 AS A14 05 14 ...
Страница 187: ...MODELS AS E07 AS E09 AS E12 AS E14 05 15 ...
Страница 188: ...MODELS AS A18 AS A24 AS A30 05 16 ...
Страница 189: ...05 17 MODELS AS A18LACH AS A24LACH AS A30LACH ...
Страница 190: ...05 18 MODELS AJ A36 45 54LALH 5 2 2 Outdoor Unit ...
Страница 195: ...6 DISASSEMBLY PROCESS ...
Страница 196: ......