![Fujitsu AB*14LBAJ Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/fujitsu/ab-14lbaj/ab-14lbaj_service-instruction_118000034.webp)
3-2. AO*30LMAW4
The defrosting shall proceed by the integrating operation time and outdoor heat exchanger temperature as follows.
(Not defrosted for 6 or 10 minutes)
3 sec later Compressor OFF
3 sec later Outdoor fan motor OFF
28 sec later 4-way valve OFF
34 sec later compressor ON
(Frequency : 92 Hz)
Heating operation start : Compressor ON
Defrost Indicator:
[Operation lamp]
9 sec ON / 1 sec OFF
Outdoor heat exchanger temperature: Over 12°C
or
Compressor ON time: Over 15 minutes
Defrost end
01-31
Compressor integrating
operation:
45 minutes and over
Outdoor heat exchanger
temperarure:
Below -10°C
Outdoor heat exchanger
temperarure:
Below -8°C
Outdoor temp. > -1°C
=
Outdoor temp. < -1°C
Defrost start
Содержание AB*14LBAJ
Страница 38: ...2 TROUBLE SHOOTING R410A INVERTER MULTI Universal Floor Ceiling Duct Cassette Wall Mounted Floor type ...
Страница 95: ...3 REPLACEMENT PARTS R410A INVERTER MULTI Universal Floor Ceiling Duct Cassette Wall Mounted Floor type ...
Страница 97: ...Thermistor Heat exchanger temp 2 way valve Liquid 3 way valve Gas 03 02 Thermo Holder Thermistor Outdoor Temp ...
Страница 116: ...1116 Suenaga Takatsu ku Kawasaki 213 8502 Japan May 2008 Printed in Japan ...