A26361-K879-Z102-3-7619
43
Hardware Installation
Installing/Removing the Rack Model
Figure 17: Routing the fibre channel optical waveguide cable with protective hose
Ê
Route the fibre channel optical waveguide cable on the articulated cable
carrier as shown in the figure and secure them with cable ties (1).
V
CAUTION!
Please make sure that the so protected fibre channel optical waveguide
cable is routed in such a way on the articulated cable carrier that in the
extended as well as in the folded condition of the carrier no damages can
occur.
4.4.4
Mounting into 3rd-Party Racks
For mounting the server in a 3rd-Party Rack the following parts from the rack
mounting kit are necessary:
–
two telescopic rails (assembled)
–
four assembly brackets (VL; VR; HL; HR are panched onto the brackets)
–
possibly eight plugwashers (figure 8 on page 33)
–
possibly protective hose for fibre channel optical waveguide cable
Ê
Take the original manual of the rack manufacturer regarding the mechanical
installation and/or the climatic conditions to assistance.
V
CAUTION!
With the installation in 3rd-Party Rack it is to be made certain that the
air flow is ensured from the front to the rear in the rack.