36
A26361-K879-Z102-3-7619
Installing/Removing the Rack Model
Hardware Installation
Ê
Using the mounting aid (stencil) mark the position of the attachment points
for the telescopic rails and for the server (front panel) on the support uprights
(five height units).
Refer to the information on the mounting aid.
Ê
Mount the support bracket at the appropriate height on the left rear support
upright as described in the Technical Manual of the DataCenter Rack.
Ê
Place the spring nuts to fasten the telescopic rails in the groove of the
support uprights at the marked attachment points.
Ê
Adjust the position of the nuts in the groove until they lock into the correct
position.
The assembled telescopic rail with assembly bracket (HL) will be secured on the
front left support upright and on the support bracket.
To fasten the left telescopic rail to the support bracket, no flange nuts are
necessary since the assembly bracket (HL) is equipped with threaded holes.
For adjustment two plugwashers must be pre-installed in the support bracket:
Ê
Place the plugwashers at the marked attachment points in the corre-
sponding holes of the support bracket (see figure 8 on page 33).