2-16
Follow the procedure below for wiring and configuration of the inverter. Figure 2.12 illustrates the wiring
procedure with peripheral equipment.
Grounding terminals ( G)
Inverter output terminals (U, V, W, and
G)
DC reactor connection terminals (P1 and P(+))*
Switching connectors* (For the models of 208 V 50HP or above, for 460 V 75HP or above. Refer to
page 2-18.)
DC link bus terminals (P(+) and N(-))*
Main circuit power input terminals (L1/R, L2/S and L3/T)
Auxiliary power input terminals for the control circuit (R0 and T0)*
Auxiliary power input terminals for the fans (R1 and T1)* (For models of 208 V 50HP or above, for 460
V 75HP or above. Refer to page 2-22.)
* Perform wiring as necessary
Figure 2.12 Wiring Procedure for Peripheral Equipment
Wiring procedure
Содержание FRENIC-ECO
Страница 111: ...5 3 F codes Fundamental Functions The shaded function codes are applicable to the quick setup...
Страница 114: ...5 6 F code continued...
Страница 115: ...5 7 E codes Extension Terminal Functions...
Страница 116: ...5 8 E code continued...
Страница 119: ...5 11 E code continued...
Страница 121: ...5 13 P codes Motor Parameters The shaded function codes are applicable to the quick setup...
Страница 122: ...5 14 H codes High Performance Functions...
Страница 123: ...5 15 H code continued...
Страница 126: ...5 18 J code continued...
Страница 127: ...5 19 J code continued...
Страница 128: ...5 20 y codes Link Functions...
Страница 129: ...5 21 y code continued...
Страница 141: ...5 33 Example of Operating Characteristics...
Страница 217: ...8 6 8 3 Common Specifications...
Страница 218: ...8 7...
Страница 223: ...8 12 8 5 External Dimensions 8 5 1 Standard models Unit inch mm 10 2 260...
Страница 227: ...8 16 8 5 3 Multi function Keypad Unit inch mm...
Страница 246: ...Fuji Electric FA Components Systems Co Ltd Fuji Electric Corp of America 2007 11 K07 K07 10CM...