![Fuji Electric FE ZSS Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/fuji-electric/fe-zss/fe-zss_instruction-manual_2341881035.webp)
INZ-TN1ZSS-E
- 25 -
5.2 Screen configuration
!
"#
$%#
$
& '
(
(
#
)*
5.3 Outline of screen
5.3.1.1 “Measurement” screen (appears when the power is turned ON)
On the MEASURE screen, measurable component, alarm, O
2
conversion measurable component, and exter-
nal input are displayed beginning at the top. When more than five items are displayed, switch the screen by
key or
key.
HC
ℓ
2006-
4
-
1
12:00:00
87.00 ppm
Inst.
Avg.
cv
HC
ℓ
65.00 ppm
0-100 ppm
0-100 ppm
Measurement
.
248
℃
0
~
450
℃
Wet
Dry
LD Failure
Inst.
Avg.
Wet
Dry
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
Содержание FE ZSS
Страница 1: ...Instruction Manual INZ TN1ZSS E CROSS STACK LASER GAS ANALYZER TYPE ZSS...
Страница 13: ...INZ TN1ZSS E 3...