![Fuji Electric FE ZSS Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/fuji-electric/fe-zss/fe-zss_instruction-manual_2341881028.webp)
- 18 -
INZ-TN1ZSS-E
4.8 Piping system diagram
!
!
"!
#$ %%
& B'(
"!
) !
*
+
φ
!
!
' ! ,
+ -. ! ! $ ' //"0/11234 "3
-
$ ! & $
! !
5!
6$ !
* (
7
&
! 8
! !
951 2 ))
#$ 8
18
4
4
%B
B'( & !
! !
)#
)#
:'
7 1;1 ! !
5! ! !
3
7 # ! ! ,
7 !
<5'=
=
5
"# !>
4
4
Fig. 4
-
10
4.9 Assembly of receiver unit and transmitter unit
(1) Prepare “Receiver box or transmitter box” and “Hexagonal socket bolt” as shown in the following fig-
ure (Fig. 4
11). (When the O-ring is not mounted to the receiver unit or the transmitter unit, mount the
O-ring.)
(2) Mount “Receiver box or transmitter box” on “Angle adjustment unit” so that the cable receptor is posi-
tioned down.
(3) Fix it with the 6 “hexagonal socket bolts”.
Fig. 4
-
11
Содержание FE ZSS
Страница 1: ...Instruction Manual INZ TN1ZSS E CROSS STACK LASER GAS ANALYZER TYPE ZSS...
Страница 13: ...INZ TN1ZSS E 3...