Operator’s Manual: Dura Dry II
Maintenance
© SP Industries, Inc.
Rev.004, 12/07
27
Tubing
All vacuum tubes must be periodically checked for cracks and
leaks.
The tubing ends of drain lines can contribute to leakage.
Periodically, they need to be cut in order to remove dried,
cracked, and stretched sections caused by insertion of the
larger drain plug.
Once the system has been maintained a performance check should be done and compared
against your original
Pre-Operational Baseline Performance Test
. If the system specifications
are not in close proximity to the original performance of the system, additional maintenance or
service may need to be performed.