Operator’s Manual: Dura Dry II
Nitrogen Trap
© SP Industries, Inc.
Rev.004, 12/07
13
Installation
The LNT is shipped separately and will need to be installed on the Dura-Dry II MP.
1. Bolt the LNT shelf to the right side of the Dura-
Dry II MP with the inlet and outlet tubing
entering the appropriate holes in the cabinet.
2. Open the door of the Dura-Dry.
3. Attach the tubing from the vacuum pump to
the upper tube from the LN
2
Trap with a hose
clamp.
4. Attach the tube from the condenser to the
bottom (inlet) tube with a hose clamp.
Installed LNT
1
2
3
4