
High-pressure
gas purging with
parting agent
program
sequence (1st
contact tip)
Move to position D
1
approx. 50 mm/1.97 in. centrally above
the opening for the high-pressure gas
purging
Contact tip 1 vertical to the service sta-
tion
Speed: High-speed mode
D
50 mm
1.97 in.
Set
external signal "Pump for parting agent"
Wait 0.2-0.3
seconds
specification of the
parting agent
volume via the dur-
ation
Reset
external signal "Pump for parting agent"
Move into the high-pressure gas pur-
ging
max. speed: 50 cm/min / 19.69 ipm
Select insertion depth so that the dis-
tance between contact tip and nozzle is
3 mm / 0.12 in.
Set
external signal "External valve brush
cleaning"
Set
external signal "High-end gas purging
(from front)"
Wait 0.5 - 1.5
seconds
74
Содержание Robacta TSS /i
Страница 2: ......
Страница 11: ...General 11 ...
Страница 12: ...12 ...
Страница 18: ...18 ...
Страница 19: ...Operating controls connections and mechanical components 19 ...
Страница 20: ...20 ...
Страница 32: ...32 ...
Страница 33: ...Installation and Startup 33 ...
Страница 34: ...34 ...
Страница 53: ...4 5 4 5 4 Connect the Robacta Reamer control cable 5 Connect the hose for the compressed air supply 53 EN US ...
Страница 61: ...12 12 12 Connect the compressed air supply 61 EN US ...
Страница 64: ...64 ...
Страница 65: ...Cleaning Program Sequence 65 ...
Страница 66: ...66 ...
Страница 68: ...A B C D E F G 68 ...
Страница 79: ...Reset external signal Internal valve brush cleaning 79 EN US ...
Страница 84: ...Reset external signal Cut wire electrode End of the cleaning process Welding 84 ...
Страница 85: ...Troubleshooting Maintenance and Disposal 85 ...
Страница 86: ...86 ...
Страница 97: ...Appendix 97 ...
Страница 98: ...98 ...