![Fronius 8,045,368 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/fronius/8-045-368/8-045-368_operating-instructions-manual_2339342028.webp)
26
230 V mains supply:
Plug the charger into the 230 V socket. The YELLOW signal lamp lights up.
IMPORTANT!
The mains voltage and frequency must be as indicated on the rating plate.
Connecting the
charger to the
mains supply
AC-AC voltage transformer
1. Plug the AC-AC voltage transformer
(a) into the 110 / 120 V socket.
2. Plug the charger into the AC-AC vol
-
tage transformer output (b).
The YELLOW signal lamp lights up.
(b)
(a)
110 / 120 V mains supply:
CAUTION! The charger may be damaged if the wrong supply voltage
is used.
The FDV MF charger is designed for a supply voltage of 230 V. Directly con
-
necting the charger to a 110 / 120 V mains supply can cause serious material
damage.
-
Ensure that the charger is always operated using the correct supply vol
-
tage.
-
Always use the AC-AC voltage transformer when operating the charger
on a 110/120 V mains supply.
Charge the
battery pack
Place battery pack in charger docking station
1. Insert the battery pack with the ridge
in the lower recess (a) of the charger
docking station.
IMPORTANT!
The charging time for
the battery pack is 45 minutes. If a
warm NiMH battery pack (> 37°C) is
used, charging takes place at a re-
duced charging current. In this case
the charging time for the battery pack
at 3.0 Ah is approx. 100 minutes.
(a)
Содержание 8,045,368
Страница 2: ......
Страница 52: ...50...
Страница 53: ...1 Spare parts...
Страница 54: ...2...
Страница 55: ...3 Carriage FDV 22 MF Art Nr 8 045 368 incl 48 0005 1217 nur Stecker plug only 48 0005 1182...
Страница 56: ...4 Torch holder for second torch Additional torch holder Art Nr 48 0005 1893 Carriage FDV 22 MF Art Nr 8 045 368...
Страница 58: ...6 Circuit diagram...
Страница 59: ...7 EU Declaration of conformity...
Страница 60: ...FRONIUS INTERNATIONAL GMBH TechSupport Automation www fronius com addresses www fronius com...