❒ Carefully raise vertical screw with suitable lifting equipment and set up vertically
❒ Position vertical screw with flange at ejection head and bolt in position
❒ Align entire unit to wall so it is plumb
➥ Possibly loosen bolts to wall duct slightly
➥ When doing so, secure entire unit with lifting equipment
Ø 12 mm
❒ Drill the holes in the bracket for the foundation
❒ Hammer in the heavy duty anchors and fix the bracket to the floor
Ø 14 mm
❒ Mark holes for cantilever bracket on wall and drill
❒ Hammer dowels into wall and screw the cantilever bracket to the wall using frame
screws M12x80
Assembly
4
Install Bunker Filling System
Installation- and Operating Intructions BFSV / BFSU | M1420116_en
35