6 Operating the System
6.1 Initial start-up
NOTICE
Efficient operation can only be guaranteed if the system is set by specialist staff
and the default factory settings are observed.
Therefore:
❒ Initial startup should be carried out with an installer approved by Fröling
Heizkessel- und Behälterbau GesmbH or with Froling customer services
During initial start-up:
❒ Check that the system has been assembled correctly
➥ Check that all the components supplied have been installed in accordance with
the assembly instructions
❒ Check the supply pipe and electrical fuse
❒ Check the direction of rotation of the screws
❒ Check that the motor overload for the drive motor is working
❒ Check the on-site protective structure of the bulk chute
➥ The bulk chute must be secured so that no one is at risk of injury while the
system is in operation.
➥ Follow the instructions for implementing the protective structure
❒ Affix the identification plate to the control cabinet
❒ Affix the “fuel store” warning notice in a conspicuous place in the access area
When the check is finished:
❒ Perform a test run and fill the store space with fuel
❒ Observe the fuel transport around the bulk chute (e.g. bridge formation) and if
necessary, regulate by adjusting cover plates
6
Operating the System
Initial start-up
42
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com