background image

6 Operating the System

6.1 Initial start-up

 

NOTICE

Efficient operation can only be guaranteed if the system is set by specialist staff
and the default factory settings are observed.
Therefore:

❒ Initial startup should be carried out with an installer approved by Fröling

Heizkessel- und Behälterbau GesmbH or with Froling customer services

 
During initial start-up:

❒ Check that the system has been assembled correctly

➥ Check that all the components supplied have been installed in accordance with

the assembly instructions

❒ Check the supply pipe and electrical fuse
❒ Check the direction of rotation of the screws
❒ Check that the motor overload for the drive motor is working
❒ Check the on-site protective structure of the bulk chute

➥ The bulk chute must be secured so that no one is at risk of injury while the

system is in operation.

➥ Follow the instructions for implementing the protective structure

❒ Affix the identification plate to the control cabinet
❒ Affix the “fuel store” warning notice in a conspicuous place in the access area

 
When the check is finished:

❒ Perform a test run and fill the store space with fuel
❒ Observe the fuel transport around the bulk chute (e.g. bridge formation) and if

necessary, regulate by adjusting cover plates

 

 

 

6

Operating the System

Initial start-up

42

Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

Содержание BFSU

Страница 1: ...of the original German operating instructions for technicians Read and follow the instructions and safety information Technical changes typographical errors and omissions reserved M1420116_en Edition...

Страница 2: ...16 3 1 1 Design with recessed bulk chute 18 3 2 Dimensions BFSU 19 3 2 1 Design with recessed bulk chute 21 3 3 Dimensions of extension shaft 22 3 4 Dimensions of mounting frame 23 3 5 Technical Speci...

Страница 3: ...connection 41 5 2 Time relay settings in the control cabinet 41 6 Operating the System 42 6 1 Initial start up 42 6 2 Adjust Filling Area to Loading Vehicle 43 6 3 Adjust the feed output to the fuel...

Страница 4: ...means that there may be minor differences from the pictures and content If you discover any errors please let us know doku froeling com Subject to technical change This is an incomplete machine as def...

Страница 5: ...unit 6 which is connected to the stationary control cabinet 5 via a flexible control line The horizontal screw of the bulk chute feeds the fuel to the transfer position From there the fuel is fed to...

Страница 6: ...g status GREEN constant STANDBY RED constant FAULT 11 Status LED for left hand filling level sensor GREEN constant Direction of rotation to the left possible RED constant Filling level reached at left...

Страница 7: ...ed it will lead to serious injury or death You must follow the instructions WARNING The dangerous situation may occur and if measures are not observed it will lead to serious injury or death Work with...

Страница 8: ...duct will invalidate its manufacturer s CE conformity In such cases the product will need to undergo new hazard evaluation procedures by the operator The operator will then be fully responsible for th...

Страница 9: ...formation in the manuals Only allow trained staff to carry out assembly and installation Assembly installation initial startup and servicing must always be carried out by qualified personnel Heating t...

Страница 10: ...unit The operator must also have read and understood the instructions in the documentation 2 3 4 Protective equipment for operating staff You must ensure that staff have the protective equipment spec...

Страница 11: ...missioned in accordance with the local fire and building regulations The following standards and regulations should be observed in any case NORM DIN EN 60204 Safety of machines Electrical equipment of...

Страница 12: ...t be visible during operation Protective structures must be designed in accordance with the applicable standards and regulations The screw of the mobile bulk chute cannot be divided To remove the scre...

Страница 13: ...he bunker filling system stops Filling level sensors Protection from overfilling the fuel store The centrifugal disc of the bunker filling system is equipped with two filling level sensors which are c...

Страница 14: ...and that no one enters the danger zone for the duration of the filling process Ensure that no one is in the store and that the entrance to the store is secured against entry for the duration of the f...

Страница 15: ...on of the individual units will take place This process may take a few seconds and is not a fault DANGER Automatic run on of individual components Serious injury possible due to moving parts with auto...

Страница 16: ...System height 1820 7580 Extension pipe 420 5760 505 738 593 752 1345 max 2000 1258 Height adjustable from 0 to 200 300 T piece 1920 Extension pipe 420 3840 250 max 980 Bulk chute 900 1900 2900 470 Sy...

Страница 17: ...ix of system lengths Length of bulk chute Possible system lengths Necessary extension pipes Screw length Weight 900 1520 1560 277 1920 420 1980 294 2420 920 2480 312 2840 1340 920 420 2900 330 3420 19...

Страница 18: ...a recessed bulk chute and is also particularly useful when dimensioning the shaft size The system lengths possible are based on the matrix given above All dimensions are specified in mm Extension pipe...

Страница 19: ...00 0 1000 174 485 1485 Grafity shaft extension 250 1000 303 50 Bulk chute 900 1900 2900 470 System length 1500 7340 300 Extension pipe 250 150 150 Bulk chute 900 1570 Bulk chute 1900 2570 Bulk chute 2...

Страница 20: ...00 2500 2560 376 2920 420 2980 393 3420 920 3480 411 3840 1340 920 420 3900 428 4420 1920 4480 447 4840 2340 1920 420 4900 464 5340 2840 1920 920 5400 482 5760 3260 1920 920 420 5820 499 6340 3840 192...

Страница 21: ...0 Extension pipe 420 3840 250 150 150 Bulk chute 900 1540 Bulk chute 1900 2540 Bulk chute 2900 3540 400 4240 300 230 Gravity shaft extension 300 min 700 Mounting frame 300 600 Fitting frame 1110 1150...

Страница 22: ...ft will reduce the system height by 500 mm All dimensions are specified in mm Extension shaft 140 mm 126 277 890 250 303 174 System height vertical 100 1 4 0 1100 Extension shaft 707 mm 518 669 1291 6...

Страница 23: ...mm Dimensioning of wall opening The following diagram is used for positioning and dimensioning of the wall opening The lower edge of the opening is the system height minus 240 mm All dimensions are s...

Страница 24: ...shorter their trajectory will be The fine proportion of the wood chips will therefore fall near the ejection head Position of ejection head The higher the ejection head is mounted the further the wood...

Страница 25: ...ed with eye bolts for transport and assembly Attachment point of ejection head Attachment points of vertical screw NOTICE Lifting with suitable lifting equipment should only be carried out by technici...

Страница 26: ...should preferably be carried out on the narrow side Positioning in the centre of the narrow side ideal The right left hand motion of the centrifugal disc and the large ejection distance of the fillin...

Страница 27: ...Positioning on the long side not recommended Assembly 4 Installation site Installation and Operating Intructions BFSV BFSU M1420116_en 27...

Страница 28: ...hin the protected area 4 During operation of the system the operator must be stationed at all times within view of the bulk chute to be able to respond immediately to any risks which might occur In th...

Страница 29: ...ructure acc to EN ISO 13857 The following figure shows an example of how the bulk chute can be executed in the filling area It is important that the user can see into the filling area for the entire f...

Страница 30: ...g level sensors are also mounted on the wall duct in this case 4 4 2 Bulk chute and vertical screw outside The ejection head is equipped as standard with an explosion protected drive which means that...

Страница 31: ...system in the fuel store does not collide with the bunker filling system 4 4 4 Bulk chute recessed in shaft Alternatively the bulk chute can be recessed in a shaft Here the built in bulk chute is use...

Страница 32: ...kets are necessary The filling level sensors are also mounted on the wall duct in this case 4 5 2 Bulk chute recessed in shaft Alternatively the bulk chute can be recessed in a shaft Here the built in...

Страница 33: ...t the position planned for mounting of the external cover plate Mount wall duct on wall There must be holes for installing the filling level sensors on the bottom flap Position ejection head at wall d...

Страница 34: ...ews M12 x 80 to the wall Fix ejection head to wall bracket 4 6 2 Install vertical screw Space the fixing clips over the height of the vertical screw at equal distances attach to the vertical screw and...

Страница 35: ...htly When doing so secure entire unit with lifting equipment 12 mm Drill the holes in the bracket for the foundation Hammer in the heavy duty anchors and fix the bracket to the floor 14 mm Mark holes...

Страница 36: ...ther the wheels or the adjustable feet using the 4 round head screws M10x20 spacer washers and safety nuts If the bulk chute is to be installed at fixed points it can be secured to the floor using hea...

Страница 37: ...bulk chute using the 4 hexagonal screws M10x30 to the bulk chute The position of the cover plate depends on the wood chip size See Adjust the feed output to the fuel page 43 Assembly 4 Install Bunker...

Страница 38: ...e out the hook on the quick fastener Move the bulk chute to the flange and secure with the quick fastener Snap the key plate into place at the safety limit switch If the key plate does not snap into p...

Страница 39: ...Screw the fitting frame onto the bulk chute using the previously loosened screws NOTICE The position of the motor for the screw must not be changed 4 6 7 Final installation steps Positioning the stic...

Страница 40: ...ILLING SYSTEM on the inside of the fitting frame Attach 2x stickers Cover plate adjustment on the left and right outer edge of the fitting frame 4 Assembly Install Bunker Filling System 40 Froling Ges...

Страница 41: ...erminal Electrical power supply to be fused by customer with C35A NOTICE Flexible sheathed cable must be used for the wiring this must be of the correct size to comply with applicable regional standar...

Страница 42: ...irection of rotation of the screws Check that the motor overload for the drive motor is working Check the on site protective structure of the bulk chute The bulk chute must be secured so that no one i...

Страница 43: ...The inlet area is equipped with adjustable cover plates to regulate the fuel feed in the bulk chute Depending on the material used they can be adjusted in three stages as required It is recommended st...

Страница 44: ...n The components in the switching unit are live 6 4 2 Start filling process DANGER If the bunker filling screw is switched on when someone is in the danger zone Risk of serious injury from rotating fe...

Страница 45: ...delayed activation of the individual units will take place This process may take a few seconds and is not a fault Simultaneously press both start buttons of the two hand tripping device one button on...

Страница 46: ...ched at the sensor the status LED of the filling level sensor for the preselected direction of rotation will light up and the filling process stops Change the direction of rotation of the centrifugal...

Страница 47: ...ht in the fuel store Release one or both start buttons of the two hand tripping device Deactivation of the units is time delayed one after the other in the following sequence DANGER Automatic run on o...

Страница 48: ...switching unit are no longer live NOTICE The main terminal in the switching unit is still live Padlock the main switch to ensure it cannot be switched on Remove the key from the padlock and keep in a...

Страница 49: ...ecautions to prevent accidental switching on Also observe the information on the notice supplied for working in the fuel store Regular inspection and cleaning prolongs the lifespan of the system and i...

Страница 50: ...jection area for dirt Check centrifugal disc for wear and ease of movement Check centrifugal disc for true running Radial run out max 10 mm 4 Fastener Check fastener for damage Check for correct tensi...

Страница 51: ...t until the motor protection switch has cooled down and switch back on Centrifugal disc blocked Centrifugal disc frozen Mechanically release or warm up centrifugal disc Vertical screw blocked Wood chi...

Страница 52: ...und Beh lterbau GesmbH Industriestra e 12 A 4710 Grieskirchen AUSTRIA TEL 0043 0 7248 606 0 FAX 0043 0 7248 606 600 INTERNET www froeling com 9 1 2 Address of the installer Stamp 9 Appendix Addresses...