4.5 Installation variants - BFSU
4.5.1 Bulk chute outside
Depending on the thickness of the wall it should be borne in mind that a wall duct (300
mm / 600 mm) is necessary for mounting the ejection head. When using a wall duct,
the ejection head is directly mounted in place, and no other fixing brackets are
necessary. The filling level sensors are also mounted on the wall duct in this case.
4.5.2 Bulk chute recessed in shaft
Alternatively, the bulk chute can be recessed in a shaft. Here the built-in bulk chute is
used instead of the standard bulk chute. During planning additional design information
should be noted in this case.
⇨ See "Installation with recessed bulk chute" [page 29]