11 - ENGLISH
5. OPERATION
5.1 COMMANDS
1. Boiler cover
It closes the boiler tank during operation. It
can easily be removed to clean.
2. Cock
Use this to extract the product from the
boiler tank. It can be poured directly into
the batching cylinder.
3. Door
It seals the cylinder during operation. It
can easily be removed to clean.
4. Safety grid – hopper cover
It allows the operator to load the product
safely. The cover prevents the mixture to
come into contact with other substances.
5. Door lock handle
It seals the door tight when the handle is
turned down.
6. Boiler pushbutton panel
Use this to select the boiler’s operating
programs.
7. Batch freezer pushbutton panel
Use this to select the batch freezer’s
operating programs.
8. Extraction door
This is used during the ice-cream
extraction phase and to drain the water
during cylinder cleaning operations.
9. Drip tray
It collects the liquids dripping from the
cylinder stuffing box.
Содержание TAYLOR IC135 Series
Страница 44: ...APPENDICI 2 8 2 Schema circuito frigorifero Refrigerant circuit diagram Kühlnetzplan ...
Страница 47: ...5 APPENDICI C 135 s01 Tav 1 10 ...
Страница 49: ...7 APPENDICI C 135 s01 Tav 2 10 ...
Страница 51: ...9 APPENDICI C 135 s01 Tav 3 10 ...
Страница 53: ...11 APPENDICI C 135 s01 Tav 4 10 ...
Страница 55: ...13 APPENDICI C 135 s01 Tav 5 10 ...
Страница 57: ...15 APPENDICI C 135 s01 Tav 6 10 ...
Страница 59: ...17 APPENDICI C 135 s01 Tav 7 10 ...
Страница 61: ...19 APPENDICI C 135 s01 Tav 8 10 ...
Страница 63: ...21 APPENDICI C 135 s01 Tav 9 10 ...
Страница 65: ...23 APPENDICI C 135 s01 Tav 10 10 ...
Страница 67: ...NOTE NOTES BEMERKUNG ...