![Fore Systems ES-2810 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/fore-systems/es-2810/es-2810_user-manual_2318852020.webp)
2 - 6
ES-2810 ATM Uplink Module User Guide
Installation
NOTE
Link aggregation (also known as load
balancing) is supported when two modules
are installed in a stack. The bandwidth from
these two modules is combined when they
are both connected to a single ATM switch.
This provides a 2 x 155 Mbps link between
the Ethernet network and the ATM ELAN.
For more information, see the ES-2810
Ethernet Switch User’s Manual. Failover is also
supported when two modules are installed in
a stack. In the event of an ATM uplink failure
on one module, all ATM traffic is sent via the
other operating module.
The finished cabling should look similar to the following (depending
on how many switches are in your stack):
Figure 7 -
Cabling for Stack Configuration
(example of a stack with three switches)
5. Once the ATM Module is cabled correctly, you can configure the mod-
ule using FORE Stack View. See Chapter 4.
NOTE
If SIM cables are connected to or
disconnected from the ATM Module (or any
other media module) in the stack while the
switch is operational, this may cause the
ATM Module to reboot.
To ATM ELAN
ATM Uplink
Module
Matrix
Module
SIM
Содержание ES-2810
Страница 4: ......
Страница 22: ...2 8 ES 2810 ATM Uplink Module User Guide Installation...
Страница 60: ...A 6 ES 2810 ATM Uplink Module User Manual Technical Specifications...