Figure 11: Recommended Piping for Combination Heating and Cooling (Refrigeration) System
WARNING
The use of a low water cut-off device, while
not required unless radiation level is below the
boiler, is highly recommended.
If a low water cut-off is required, it must be
mounted in the system piping above the boiler.
The minimum safe water level of a hot water boiler
is just above the highest water containing cavity of
the boiler; that is, a hot water boiler must be full of
water to operate safely.
5.
If it is required to perform a long term
pressure test of the hydronic system
,
the
boiler should first be isolated from the system
to avoid a pressure loss due to the escape of
air trapped in the boiler.
To perform a long term pressure test including
the boiler, ALL trapped air must first be
removed from the boiler.
A loss of pressure during such a test, with no
visible water leakage, is an indication that the
boiler contained trapped air.
4
Water Boiler Piping
(continued)
!
Содержание FORCEOL115-E
Страница 56: ...56 106346 06 8 19 FORCE Installation Operating Service Manual Bare Boiler Assembly 15 Service Parts continued...
Страница 58: ...58 106346 06 8 19 FORCE Installation Operating Service Manual Jacket Assembly 15 Service Parts continued...
Страница 61: ...61 106346 06 8 19 FORCE Installation Operating Service Manual Beckett AFG Burner 15 Service Parts continued...
Страница 63: ...63 106346 06 8 19 FORCE Installation Operating Service Manual Beckett NX Burner 15 Service Parts continued...