c. Allow the temperature to drop below control
setting. The burner must restart.
d. Boiler installation is not considered
complete until this check has been made.
5. CHECK LOW WATER CUT-OFF
a. Press and hold the test / settings button for
5 seconds.
b. The red low water light should illuminate
and the burner circuit (B1 & B2) should de-
energize.
6. CHECK AFTERMARKET LOW WATER CUT-
OFF CONTROL, if required on this boiler
application. See Appendix "B" at the rear of
this manual for 'How to Test'.
J . IF CONTROLS MEET REQUIREMENT
outlined
in Paragraph I.
Allow boiler to operate for approximately 30
minutes, confirm the boiler and system have no
leaks.
K .
IF CONTROLS DO NOT MEET
REQUIREMENTS
outlined in Paragraphs I-1
thru I-5, replace control and repeat checkout
procedures.
10
System Start-Up
(continued)
Содержание FORCEOL115-E
Страница 56: ...56 106346 06 8 19 FORCE Installation Operating Service Manual Bare Boiler Assembly 15 Service Parts continued...
Страница 58: ...58 106346 06 8 19 FORCE Installation Operating Service Manual Jacket Assembly 15 Service Parts continued...
Страница 61: ...61 106346 06 8 19 FORCE Installation Operating Service Manual Beckett AFG Burner 15 Service Parts continued...
Страница 63: ...63 106346 06 8 19 FORCE Installation Operating Service Manual Beckett NX Burner 15 Service Parts continued...