
Wireless DC Clamp
Performance Tests
11
DC Voltage Verification
Before you do the dc voltage verification:
1.
Make sure you have the necessary equipment. See Table 2.
2.
Make sure the Meter battery is good and replace it if necessary. See
3.
Warm up the Calibrator as necessary. Refer to the specifications for the Calibrator.
4.
Let the temperature of the UUT become stable to room temperature.
Start the dc voltage verification.
1.
Follow the instructions to enter Maintenance mode (see
) and then:
a.
Push
until
TEST
shows on the display.
b.
Push
. The Meter is in verification mode.
2.
Connect the Calibrator to test leads and three of the six leads in the cable, as shown in Figure 5. (The white lead
connects to the NORMAL Hi terminal of the 5522A. The yellow and black leads connect to the NORMAL LO
terminals.)
3.
Apply the input level for each value shown in Table 3 and compare the UUT indication on the display with the
UUT reading limits.
If the display indication falls outside of the range shown in Table 3, calibration adjustment or repair is necessary.
See
.
Figure 5. Performance Verification Connections for Simulated Voltages
5522A
0
•
/
+
HI
LO
TC
1000V
RMS
MAX
20V
RMS
MAX
20V
PK
MAX
1V PK
MAX
20V PK
MAX
NORMAL
AUX
TRIG
OUT
SCOPE
V, ,
RTD
A, -SENSE,
AUX V
150V PK
MAX
20V PK
MAX
22
LO
G
a3004 FC
i20
Содержание A3003 FC
Страница 4: ...ii a3003 a3004 FC Calibration Manual...