![Fluke 7312 Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/fluke/7312/7312_user-manual_2309393070.webp)
The cutout is calibrated by adjusting a potentiometer inside the unit while the
bath is at the triple point maintenance temperature. The bath temperature
should be known to within
±
0.05
°
C. A DVM capable of measuring accurately
to 10mV is required.
To access the cutout circuit board, the front panel must be removed. Be sure to
disconnect the power to the unit before beginning. It is best to move quickly to
avoid much bath temperature change. Begin by removing the 4 screws attach-
ing the sloping controller panel. Lift up the controller panel to access the fas-
teners attaching the front sheet metal panel. Remove the two fasteners located
at the top left and right corners of the panel. The bottom of the panel is retained
by a screw on either side of the panel that is in a key-hole shaped slot. Lift up
the panel and wiggle slightly so that the screw heads come out through the
larger portion of the slot. The bottom screws are not to be removed. Once the
panel is removed, set it aside and temporarily replace the controller panel rein-
stalling the screws to hold it in place.
Reestablish the power connection to the bath and allow the bath to regain stable
control at the required set-point. This procedure takes 15 minutes or longer de-
pending on how long the bath has been off and how far it has drifted off tem-
perature. Be aware that the bath has a low voltage line monitor that activates
when the power is disconnected. Several minutes are required before the unit is
permitted to turn on. Note the amber light on the back of the unit.
WARNING:
Shock hazard! High Voltage power is accessible.
Identify the cutout PC board on the left side of a sheet metal shelf below the
temperature controller boards. Locate on the cutout board the two test points
TP1 and TP2 and attach the DVM.
In order to prevent the cutout from activating during adjustment it must be
turned off in the controller menu. To disable the low temperature cutout, access
the operating parameters menu. Follow the instructions in Section 9.11.2 and
set the triple point cutout (tP CO) to OFF toggling with either the up or down
keys. Set the water triple point cutout to 0.01°C. With the bath controlling at
0
°
C to 0.01°C, adjust VR1 on the board until the voltage reads 0 volts. After
the adjustment, return the cutout to the ON condition and set the water triple
point cutout set-point to –0.3°C.
69
11 Calibration Procedure
Calibrating the Triple Point of Water Cutout
Содержание 7312
Страница 2: ......
Страница 3: ......
Страница 15: ... Serial Number Voltage Complete description of the problem 7 1 Before You Start Authorized Service Centers ...
Страница 18: ......
Страница 29: ...25 6 Bath Use Triple Point of Water Cell Maintenance Fluid Level in Bath Figure 3 Fluid Level ...