GARANT drag hose spreader
Preparation and setup
Fliegl Agrartechnik GmbH, 84453 Mühldorf am Inn, Germany
40 of 77
Attach the rod eye at the end of the hydraulic
cylinder to the spreader.
Fig. 25
:
Attaching the cylinder rod eyes
Guide value:
Secure in 1st or 2nd position
(Monitor the folding action; the
spreader must fold softly)
6.4 Spreader hydraulics
Pressure sequence valve:
The spreader arms are folded using a
pressure sequence valve. The valve is
usually fitted in the factory. The
hydraulic lines of the lift cylinders and
the folding cylinders of the spreader
arms must be connected to the
pressure sequence valves.
Screw time relay with switching valve:
(Changes the direction of rotation of the
screw distributors)
The oil motors of the screw distributors
must be connected to this valve via
hydraulic hoses.
Fig. 26
:
Pressure sequence valve
Fig. 27
:
Screw time relay