background image

© 1999-2007 QualityWaterForLess.com

 

- 17 - 

[email protected] 

slowly in this manner for an additional 5 minutes. Next, with the cold water faucet 
still running, gradually move your bypass valve to the fully open position. 

NOTE: You may see some initial discoloration from the softened water – this 
is normal and should dissipate within the first 40-50 gallons of water used.

 

 

Turn off the nearby cold water faucet when the water runs clear. 

 

Add approximately five gallons of water to your brine tank, and add 120-160 
pounds of pellet, solar, or block salt or potassium chloride to your brine tank. 

 

 

Enjoy Your Softener! 

Congratulations, you have successfully installed your new water softener with Fleck 
9100SXT Meter Valve! 
 
Please maintain your system by keeping the softener plugged-in and always keep your 
brine tank filled with salt to at least above the water level. 
 
We appreciate your business, and hope that you enjoy years of trouble-free softened 
water! 
 

 

 

- QualityWaterForLess.com 

 

Содержание 9100SXT Meter

Страница 1: ...1999 2007 QualityWaterForLess com 1 info qualitywaterforless com INSTALLATION START UP INSTRUCTIONS FLECK 9100SXT METER TWIN ALTERNATING WATER SOFTENER SYSTEMS...

Страница 2: ...for placement of your system Level firm surface such as concrete on which to place the softener tank and salt tank as known as a brine tank Nearby floor drain or standpipe to connect to the softener...

Страница 3: ...lace a piece of duct tape over the top of the riser to prevent resin from dropping down inside the riser tube as shown in Figure 3 Place the included filling funnel over the top the tank as shown in F...

Страница 4: ...below Please repeat this for the main valve and the secondary portion as shown below FIGURE 5 FIGURE 6 Next place the Fleck 9100SXT Meter Valve and secondary portion onto the top of each tank being s...

Страница 5: ...icate the o rings on the 9100SXT Valve meter assembly as shown in figure 10 below Finally push the yoke or bypass valve snugly to the back of the 9100SXT valve Use the clips screws to secure each side...

Страница 6: ...below Use the included screws and clips to secure both sides of this connection as shown in figure 16 below FIGURE 14 FIGURE 15 FIGURE 16 Plumbing your Fleck 9100SXT Meter Before beginning your instal...

Страница 7: ...heat damage during soldering Once all connections have been made place the system into bypass by either using your existing 3 valve bypass if ordered with a Yoke adaptor or by switching your included...

Страница 8: ...tank and remove the brine tank cover shown on the following page in Figure 20 Next locate the brine well and remove the cap as shown in Figure 21 on the following page FIGURE 20 FIGURE 21 Pull the 23...

Страница 9: ...so they are securely onto the tubing as shown in Figure 24 below NOTE Please be sure to assemble the nut in the fashion described to prevent system malfunction and possible brine tank overflow Hand t...

Страница 10: ...ing the fitting using a wrench snugly into the threads as shown in Figure 28 below Please use caution not to over tighten this fitting FIGURE 26 FIGURE 27 Next assemble your I D drain line to the drai...

Страница 11: ...same measure and both figures can be treated interchangeably If you get a hardness figure in PPM or mg L please divide this number by 17 1 to get Grains Ex If your hardness is measured at 300 PPM you...

Страница 12: ...ttons as shown in figure 34 below The display should now show DF GAL as shown in figure 35 below This indicates U S Operation Mode Gallons Do not change this value and press the Extra Cycle Button onc...

Страница 13: ...e 39 below This indicates which tank is currently in service Do not change this value and press the Extra Cycle Button once to continue FIGURE 38 FIGURE 39 The display should now show C 24 0 as shown...

Страница 14: ...own in figure 43 below This indicates the Safety Factor is 20 percent Use the UP or DOWN button to change this value to 10 and press the Extra Cycle Button once to continue when finished FIGURE 42 FIG...

Страница 15: ...wn in figure 47 below This indicates Rapid Rinse Time is 10 minutes Do not change this value and press the Extra Cycle Button once to continue if this value is different use the UP or DOWN buttons to...

Страница 16: ...iate between AM and PM times FIGURE 49 FIGURE 50 Congratuations Your new 9100SXT system is now programmed and ready for operation Please move on to the next section on the following page to initialize...

Страница 17: ...nearby cold water faucet when the water runs clear Add approximately five gallons of water to your brine tank and add 120 160 pounds of pellet solar or block salt or potassium chloride to your brine t...

Отзывы: