background image

© 1999-2007 QualityWaterForLess.com

 

- 11 - 

[email protected] 

 
 
      
 
 
 
 
 

 
 

 
                        FIGURE 28                                                   FIGURE 29 

 

 

Connect the other end of this drain line tubing SECURELY to a standpipe or 
drain in accordance with all local plumbing codes. 

NOTE: Be sure that the 

drain line is securely in place before the use of the water softener system. 
When the system regenerates, there will be increased flow via this tubing, 
which may cause the tubing to become loose.

 

 

 

Programming the Fleck 9100SXT Meter Valve: 

 

Before start-up a few simple steps must be followed to program the Fleck 
9100SXT Meter Valve. 

 

It will be important to know what your water Hardness and Iron is before doing 
this programming procedure. If you do not know your water hardness, or if you 
are unsure, you may wish to have it tested by sending us a sample for testing, or 
by taking a sample to a local pool supply, or hardware store. 

 

Your Hardness test results may indicate “Grains”, “PPM”, or “mg/L”. It is 
important to note that PPM and mg/L are the same measure and both figures can 
be treated interchangeably. If you get a hardness figure in PPM or mg/L, please 
divide this number by 17.1 to get Grains. 

Ex: If your hardness is measured at 

300 PPM, your Grains are 300 / 17.1 = 18 Grains.

 

 

Your Iron results should be measured in either “PPM” or “mg/L”. Add your level 
of iron multiplied by 5. Add this number to your hardness level. This final figure 
will be your Total Hardness Level that we will program into your softener system. 

 

To begin programming, first plug in your 9100SXT Valve to a nearby wall outlet. 
The system will illuminate 4 digits. The system will show the time of day, the 
current tank in service, and the amount of gallons remaining. This display will 
switch between these valves about every 10 seconds.  

 

Access the timer control by loosening the cover thumbscrews as shown in figures 
30 and 31 on the following page. 

 

Set the time on the system to 12:01 PM by pressing either the “UP” or “DOWN” 
arrow as shown in figure 32 on the following page. You may hold the button to 
allow the time to scroll faster. 

 

Once the time display is set to 12:01 PM, press the “extra cycle” button once as 
shown in figure 33 on the following page. 

Содержание 9100SXT Meter

Страница 1: ...1999 2007 QualityWaterForLess com 1 info qualitywaterforless com INSTALLATION START UP INSTRUCTIONS FLECK 9100SXT METER TWIN ALTERNATING WATER SOFTENER SYSTEMS...

Страница 2: ...for placement of your system Level firm surface such as concrete on which to place the softener tank and salt tank as known as a brine tank Nearby floor drain or standpipe to connect to the softener...

Страница 3: ...lace a piece of duct tape over the top of the riser to prevent resin from dropping down inside the riser tube as shown in Figure 3 Place the included filling funnel over the top the tank as shown in F...

Страница 4: ...below Please repeat this for the main valve and the secondary portion as shown below FIGURE 5 FIGURE 6 Next place the Fleck 9100SXT Meter Valve and secondary portion onto the top of each tank being s...

Страница 5: ...icate the o rings on the 9100SXT Valve meter assembly as shown in figure 10 below Finally push the yoke or bypass valve snugly to the back of the 9100SXT valve Use the clips screws to secure each side...

Страница 6: ...below Use the included screws and clips to secure both sides of this connection as shown in figure 16 below FIGURE 14 FIGURE 15 FIGURE 16 Plumbing your Fleck 9100SXT Meter Before beginning your instal...

Страница 7: ...heat damage during soldering Once all connections have been made place the system into bypass by either using your existing 3 valve bypass if ordered with a Yoke adaptor or by switching your included...

Страница 8: ...tank and remove the brine tank cover shown on the following page in Figure 20 Next locate the brine well and remove the cap as shown in Figure 21 on the following page FIGURE 20 FIGURE 21 Pull the 23...

Страница 9: ...so they are securely onto the tubing as shown in Figure 24 below NOTE Please be sure to assemble the nut in the fashion described to prevent system malfunction and possible brine tank overflow Hand t...

Страница 10: ...ing the fitting using a wrench snugly into the threads as shown in Figure 28 below Please use caution not to over tighten this fitting FIGURE 26 FIGURE 27 Next assemble your I D drain line to the drai...

Страница 11: ...same measure and both figures can be treated interchangeably If you get a hardness figure in PPM or mg L please divide this number by 17 1 to get Grains Ex If your hardness is measured at 300 PPM you...

Страница 12: ...ttons as shown in figure 34 below The display should now show DF GAL as shown in figure 35 below This indicates U S Operation Mode Gallons Do not change this value and press the Extra Cycle Button onc...

Страница 13: ...e 39 below This indicates which tank is currently in service Do not change this value and press the Extra Cycle Button once to continue FIGURE 38 FIGURE 39 The display should now show C 24 0 as shown...

Страница 14: ...own in figure 43 below This indicates the Safety Factor is 20 percent Use the UP or DOWN button to change this value to 10 and press the Extra Cycle Button once to continue when finished FIGURE 42 FIG...

Страница 15: ...wn in figure 47 below This indicates Rapid Rinse Time is 10 minutes Do not change this value and press the Extra Cycle Button once to continue if this value is different use the UP or DOWN buttons to...

Страница 16: ...iate between AM and PM times FIGURE 49 FIGURE 50 Congratuations Your new 9100SXT system is now programmed and ready for operation Please move on to the next section on the following page to initialize...

Страница 17: ...nearby cold water faucet when the water runs clear Add approximately five gallons of water to your brine tank and add 120 160 pounds of pellet solar or block salt or potassium chloride to your brine t...

Отзывы: