57
7. Holding the fitment in place, raise the open
end of the tray and flip the tray right side up.
As the tray is set back down, allow the bag
to settle in the tray. (See Figure 158.)
Figure 158
8. Make sure the syrup bag is settled neatly
into the tray, and then install the loaded tray
into the cabinet. (See Figure 159.)
Figure 159
9. Clean the outer surfaces of the Syrup Bag
Connector with detergent water, single
service towel and brush if necessary. Then
rinse and dry the connector using clean
water and single service towels. (See
Figure 160.)
Figure 160
10. Using a spray bottle of approved sanitizer
solution, spray the syrup bag fitment and
the Syrup Bag Connector. Allow these
parts to sanitize for at least 1 minute. (See
Figure 161.)
Figure 161
11. Attach the Syrup Bag Adapter to the bag
fitment. (See Figure 162.)
Figure 162
12. Connect the Syrup Bag Connector to the
Syrup Bag Adapter. (See Figure 163.)
Figure 163
13. Select and touch the number of the new
syrup flavor to prime that pump.
Содержание FB 80-08
Страница 5: ...4 General System Overview Figure 1 ...
Страница 7: ...6 26 MIS 3067 OPEN CLOSED BUSHING 1 Strain relief for internal 9 Tube Assembly ...
Страница 12: ...11 Syrup Pump and Related Parts Figure 4 ...
Страница 14: ...13 Sanitizer Pump and Related Parts Figure 5 ...
Страница 16: ...15 Electronic Parts and Connections Figure 6 ...
Страница 18: ...17 Spare Parts Kit Figure 7 ...
Страница 19: ...18 ...
Страница 23: ...22 ...
Страница 31: ...30 ...
Страница 65: ...64 ...