
28
6. Lifting up with the bag fitment, press the
center pin of the bag fitment valve and
gently press on the bag to release any
excess air. (See Figure 43.)
Figure 43
7. Place the tray up-side-down over the bag
and pull the fitment into the tray opening as
shown. The grooves of the bag fitment
should slide into the tray opening. (See
Figure 44.)
Figure 44
8. Holding the fitment in place, raise the open
end of the tray and flip the tray right side up.
As the tray is set back down, allow the bag
to settle in the tray. (See Figure 45.)
Figure 45
9. Make sure the syrup bag is settled neatly
into the tray, and then install the loaded tray
into the cabinet. (See Figure 46.)
Figure 46
10. Clean the exposed surfaces of the Syrup
Bag Connector and bag fitment with
detergent water, single service towel and
brush if necessary. Then rinse and dry the
Connector and fitment using clean water
and single service towels. (See Figure 47.)
Figure 47
11. Using a spray bottle of approved sanitizer
solution, spray the syrup bag fitment and
the Syrup Bag Connector. Allow these
parts to sanitize for at least 1 minute. (See
Figure 48.)
Figure 48
Содержание FB 80-08
Страница 5: ...4 General System Overview Figure 1 ...
Страница 7: ...6 26 MIS 3067 OPEN CLOSED BUSHING 1 Strain relief for internal 9 Tube Assembly ...
Страница 12: ...11 Syrup Pump and Related Parts Figure 4 ...
Страница 14: ...13 Sanitizer Pump and Related Parts Figure 5 ...
Страница 16: ...15 Electronic Parts and Connections Figure 6 ...
Страница 18: ...17 Spare Parts Kit Figure 7 ...
Страница 19: ...18 ...
Страница 23: ...22 ...
Страница 31: ...30 ...
Страница 65: ...64 ...