FTS 370d/w/r
Revision 10 – 1/09/2015
71
Lighting Inspection (LI)
The following three options are available
via the Web interface to perform a
Lighting Inspection: Auto Fast LI, Manual
Fast LI and Manual Staged LI.
A brief
description of each LI type is provided on-
screen beside the selection. The Test Page
button displays previous LI results or
displays the current LI in progress.
Auto Fast LI
Once initiated, the Auto Fast LI requires
no additional input from the user.
The
results are displayed automatically upon
completion of the Lighting Inspection.
Manual Fast LI
The Manual Fast LI mode tests the
beacons and markers simultaneously. The
restore stages are held awaiting user input
before advancing to the next test. In this
mode,
the
user
must
press
“Cont.”
(Continue) before the system will restore
the alarms and advance to the next test.
The results are displayed once all tests are
completed.
Manual Staged LI
The Manual Staged LI tests each lighting
component individually in sequence. The
restore stage for each component is held
awaiting user input before advancing to
test the next component. In this mode, the
user must press “Cont.” (Continue) before
the system will restore the alarm and
advance to the next test. The results are
displayed once all tests are completed.
Содержание VANGUARD FTS 370d
Страница 2: ......
Страница 36: ...24 Revision 10 1 09 2015 FTS 370d w r Figure 2 5 Marker Interface Wiring ...
Страница 50: ...38 Revision 10 1 09 2015 FTS 370d w r Figure 2 19 Typical D1 D2 System Wiring Diagram PHD 512 PHOTODIODE ...
Страница 54: ...42 Revision 10 1 09 2015 FTS 370d w r Figure 2 21 Typical Catenary System Wiring Diagram ...
Страница 94: ...This page intentionally left blank ...
Страница 96: ...84 Revision 10 1 09 2015 FTS 370d w r Figure 6 1 SC 370 AC Component Locations ...