2. INSTALLATION RESPONSIBILITIES
WARNING:
The Fire and Flue system must be installed in accordance with AS/NZS
2918:2001 and the appropriate requirements of the relevant NZ Building Code or
Codes. If the flue system has been AS/NZS 2918:2001 Appendix F tested by the flue
system manufacturer then their specifications for the installation of the Flue system
must be adhered to.
Any modification of the Fire that has not been approved in writing by the testing
authority is considered to be in breach of the approval granted for compliance with
AS/NZS 4013.
CAUTION:
Mixing of Fire or Flue
-
system components from different sources or
modifying the dimensional specification of components may result in hazardous
conditions. Where such action is considered, the manufacturer should be consulted in
the first instance.
Strict adherence to these instructions will meet these standards. Any variation from
these installation instructions or any doubt about them must be checked against the
requirements of the standards.
3. FLOOR PROTECTION REQUIREMENTS
IN A MASONRY FIREPLACE
AS/NZ2918 Section 3.3 states that if the Fire is to be placed on or within 500mm of
heat sensitive materials in the floor
, then a
floor protector will be required. This
floor protector shall extend under the Fire and not less than 300mm beyond the front
of the fuel loading or ash removal openings. The width of the floor protector shall be
not less than the width of the Fire and shall extend not less than 300mm from each
side of the fuel loading or ash removal openings unless it forms an abutment with a
wall or heatshield at a lesser distance.
The Fire and floor protector must be fixed with seismic restraints, to the anchor points
that are provided through the 2 front feet of the unit.
Содержание Topaz RURAL
Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...