CLEARANCES AND FLOOR PROTECTOR
REQUIREMENTS FOR A ZERO CLEARANCE BOX
(Built
-
in Fire Canopy) WITH HEAT SENSITIVE FLOOR
300
450
The Topaz raised 300mm requires an insulated floor protector to AS/NZS 2918:2001 i.e. a
floor protector consisting of a continuous durable no
-
combustible upper surface.
The Topaz has been designed for both non
-
masonry Zero Clearance Box
-
( Built
-
in Fire
Canopy) and masonry installations. The minimum distance from the base of the fire (noted
as X on the diagram) to the ash floor protector is 300mm. The distance can be less than
150mm if the hearth is an insulated hearth of 450mm and the clearance from the top of the
fire box to the ceiling is no less than 1500mm.
The ash floor protector must be of a minimum of 450mm from the fire breast, the width must
be no less than 840mm.
Position
Clearance
(mm)
Note
C
1500
Minimum from ceiling to the
top of the metal canopy of
the fire
D
300
Minimum from the top of the
ash floor protector to the
bottom of the metal canopy
of the fire
E
450
Minimum for the ash floor
protector front to fire breast
X
NA
Shows the line of the bottom
of the metal canopy of the
fire
IMPORTANT: 9.5mm Supalux Heat Resistant Clad-
ding is Stipulated in this installation guide as the
clading to use in non
-
masonry situations. The wall
cladding temperature can get hot to the touch and it
is recommended that advice is sought from a reputa-
ble paint manufacturer with regard to the type of wall
paint used.
Содержание Topaz RURAL
Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...