Firenzo Topaz RURAL Скачать руководство пользователя страница 29

Topaz RU Installation 

-

 April 2019

 

 

29

 

10. MAINTENANCE

 

FLUE

 

Creosote is caused by burning wet fuel, leaving particles and condensation to build up on the inside of any closed 

solid fuel   Fire.  Creosote and soot left to build up can cause  decreased heat performance and flue fires.  Your 

heating retailer or local    reputable chimney sweep will be able to assist with flue cleaning. 
 
 

SECONDARY CHAMBER

 

The baffles (horizontal bricks in the ceiling of firebox) are critical to the Fires performance. They should be checked   
annually during flue cleaning and replaced if signs of deterioration are evident. 

 

DOOR HANDLE AND HINGES     

 

Light  lubrication  is  recommended  once  a  year  before  the  first  autumn  burn.    Use  a  little  GRAPHITE 
grease,  available from any garage or engineering outlet. 

 

PAINTWORK  

 

If  any  scratches  or  surface  marks  have  appeared  on  the  paintwork,  use  ‘Stovebright’    Metallic  Black  paint  to        
retouch, taking note of the manufacturer’s instructions for spraying.  Never spray a hot fire.

 

 

FIRE BRICKS

 

The internal fire bricks on the sides and base of the firebox can crack in extreme heat. However they are 
safe to leave as is until they start to crumble in which case they should be replaced.

 

 

FIRE ROPE

 

As part of general maintenance the door rope and glass tape should be checked and replaced           
regularly. Failure to do this may overfire your fire. 

 

 

WELDS

 

The 5mm exposed steel sill and deflector in the fire box is welded on each side but primarily to the    

firebox underneath. With expansion and contraction the side welds develop hairline cracks. Do not be 

alarmed the main weld is sound and the Fire will not be effected in any way. Any hairline cracks are not 

a structural problem

 

 

INTERNAL DISCOLOURATION

 

A brown (rust like) colouration will develop on the exposed inside of the fire box. This is expected over time and 
does not affect the performance of the fire.

 

Содержание Topaz RURAL

Страница 1: ...e use of a NZ Home Heating Association solid fuel Fire installation technician SFAIT or other suitably qualified person The Fire and Flue System must be installed in accordance with AS NZS2918 All Ins...

Страница 2: ...t of Flue System Outlet 11 12 7 Typical Insulation Requirement 13 24 8 Clearances Floor Protector for a Zero Clearance Box Built In Fire Canopy 25 Installation of Kaowool ISB Insulation 26 Assembly In...

Страница 3: ...AEROSOLS in the vicinity of this FIRE when it is operating Use caution when reloading with fuel Do NOT attempt to load fuel into the Fire when the fire inside the stove is at or near its peak Do NOT b...

Страница 4: ...facturer should be consulted in the first instance Strict adherence to these instructions will meet these standards Any variation from these installation instructions or any doubt about them must be c...

Страница 5: ...heat sensitive materials in its construction it must meet the following MINIMIUM dimension as marked A B from Diagram above A 300mm from breast of fire to outer edge of concrete floor protector heart...

Страница 6: ...nt to check the condition of your masonry chimney Ensure any cracks are sealed loose masonry repaired and the chimney swept Check the dimensions of your fireplace opening are adequate to accept the ne...

Страница 7: ...and 10 6 Now that the Firebox and Flue are in position place 25mm white Kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire M...

Страница 8: ...The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue is extended over the chimney liner by 180mm Secure top spacer bracke...

Страница 9: ...Topaz RU Installation April 2019 9 6 INSERT FLUE SYSTEM FOR INSTALLATION IN A ZERO CLEARANCE BOX BOX Built in Fire Canopy...

Страница 10: ...f the floor protec tor 2 The flue cowl must be at least 600mm above the highest point of the roof if within 3 metres of it or 1 metre above the roof penetration if more than 3 metres from the ridge 3...

Страница 11: ...nstallation April 2019 11 7 TYPICAL INSULATION REQUIREMENTS FOR MASONRY Vent 50x100 minimum 450 Minimum Gap so Fascia fits is 300mm If lower than 150mm Insulated Hearth required If greater than 150mm...

Страница 12: ...nd masonry enclosure at the FRONT ONLY to a maximum depth of 80mm UNDER NO CIRCUMSTANCES SHOULD THE AIR SUPPLY INTO THE AIRPORTS ON THE SIDE OF THE FIRE BE RESTRICTED SIDE PILLAR CLEARANCE The minimum...

Страница 13: ...Built in Fire Canopy A ZERO CLEARANCE BOX Built in Fire Canopy IS REQUIRED IF THE FIRE IS NOT BEING INSTALLED INTO A MASONRY FIREPLACE For built in Zero Clearance Box Built in Fire Canopy installatio...

Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 17: ...Topaz RU Installation April 2019 17 1350 1355 1000mm 1460 300 min 1000mm 300 min 700 min ZERO CLEARANCE BOX Built in Fire Cano...

Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 22: ...learance to framing all round Zero clearance must sit on 40mm base provided Zero Flue starter must be used Minimum height to first framing 700mm The minimum height must be 300mm Minimum height to ceil...

Страница 23: ...of 20mm of Insulation board Promatech H Eterpan LD Pacbld Pro or product of similar thermal resistance and tiles slate or similar with sealed joints on top surface to protect from spilt ash embers FLO...

Страница 24: ...the clearance from the top of the fire box to the ceiling is no less than 1500mm The ash floor protector must be of a minimum of 450mm from the fire breast the width must be no less than 840mm Positio...

Страница 25: ...Topaz RU Installation April 2019 25 INSTALLATION OF KAOWOOL AND ISB INSULATION IN A ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 26: ...EALAND BEING AN EARTHQUAKE PRONE COUNTRY IT IS IMPORTANT TO ANCHOR THE INSERT DOWN IN CASE OF MOVEMENT Restraint points are provided through the fires two front legs See diagram below 6 Install Flue a...

Страница 27: ...or carefully and place small pieces then larger logs on top 6 Close door tight and leave Air Control on HIGH for some 30 minutes The value in establishing this technique is that you are providing an e...

Страница 28: ...st empty Fire set at the same position Remember you only get out of any Fire what you put into it The better the fuel the better the Fire Do NOT burn plastic household refuse or driftwood This will vo...

Страница 29: ...d on the paintwork use Stovebright Metallic Black paint to retouch taking note of the manufacturer s instructions for spraying Never spray a hot fire FIRE BRICKS The internal fire bricks on the sides...

Страница 30: ...material for the glass should be replaced at this time also NEVER place glass directly against the door Without the insulation seal tape in place the glass is likely to shatter Your Firenzo Dealer wi...

Страница 31: ...arantees Act 1993 To the fullest extent permitted at law no other warranties or guarantees express or implied are assumed or given by Firenzo to any person with respect to the quality merchantability...

Страница 32: ...ered by the warranties or the entire Firenzo wood fire at its discretion where Firenzo is reasonably satisfied a defect is solely due to faulty Firenzo workmanship or materials 14 Firenzo may decline...

Страница 33: ...y questions about the warranties or this document please contact Firenzo at its specified address on telephone 06 8438260 by email at firenzo firenzo co nz or via the Firenzo website www firenzo co nz...

Страница 34: ...core Lady Kitchener Napier Viking Vision Insert Aqualux Athena Bay Flush Forte Bay Flush Kompact Athena Kompact Deco Kompact Diva Kompact Forte Kompact Plaza Kompact Serenity Topaz 98 Niven Street PO...

Отзывы: