![Firenzo Topaz RURAL Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/firenzo/topaz-rural/topaz-rural_installation-and-operation-manual_2291891012.webp)
Topaz RU Installation
-
April 2019
12
As this fire sources its combustion air from the chimney cavity, the fire
must be sealed using the yellow ISB insulation provided around the front
of the casing and masonry enclosure at the FRONT ONLY to a maximum
depth of 80mm.
UNDER NO CIRCUMSTANCES SHOULD THE AIR SUPPLY INTO THE
AIRPORTS ON THE SIDE OF THE
FIRE BE RESTRICTED
SIDE PILLAR CLEARANCE
The
minimum clearance
from the side of the fascia to any heat
sensitive material must be
5mm
providing the material does
NOT
protrude
more than
150mm.
Heat sensitive Mantels are NOT allowed with the Topaz Fire.
Содержание Topaz RURAL
Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...