ASSEMBLY INSTRUCTIONS
ZERO CLEARANCE BOX
-
(Built
-
in Fire Canopy)
1
Carefully remove all packaging.
2
If installation is into a
BUILT
-
IN CANOPY
: Construct the canopy box and install into
framework following the guides on pages 13
-
24 as applicable.
3
Before insertion into the Built
-
In Fire Canopy
place 25mm white Kaowool blan-
ket
(supplied) on top of casing
page 25.
4
Slide the firebox into the opening so that the outer casing return folds are flush with
the face of the in
-
built canopy.
5
DUE
TO NEW ZEALAND BEING AN EARTHQUAKE PRONE COUNTRY
IT IS
IMPORTANT TO ANCHOR THE INSERT DOWN IN CASE OF MOVEMENT.
Restraint points are provided through the fires two front legs. (See diagram below)
6
Install Flue as per instructions on pages 8, 9 & 10 if using a Built
-
In fire canopy
(zero clearance box).
7
As this fire sources its combustion air from the chimney cavity/enclosure, the fire
MUST be sealed around the front between the casing and built
-
in canopy. This is
achieved by packing the yellow ISB insulation supplied between the casing and the
built
-
in canopy at the FRONT ONLY to maximum depth of 80mm. Page 26.
UNDER NO CIRCUMSTANCES
SHOULD THE AIRPORTS ON THE SIDE OF THE FIRE
BE RESTRICTED.
8 Assemble and fit the fascia as per instructions.
Содержание Topaz RURAL
Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...
Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...