Firenzo Topaz RURAL Скачать руководство пользователя страница 27

Topaz RU Installation 

-

 April 2019

 

 

27

 

9. OPERATING INSTRUCTIONS

 

 

PLEASE READ FULLY BEFORE PROCEEDING ANY FURTHER.

 

KEEP THIS BOOK IN A SAFE PLACE.

 

 

Please refer to 

Lighting your Firenzo Woodfire Insert Fire

 leaflet 

 

FIRST BURN

 

On the INITIAL LIGHTING only, the high temperature paint finishes used on your Fire 
will give off smoke and odour for several hours.  As this is a temporary condition, open 
doors, windows, etc. to give adequate ventilation until passed.

 

1.   Prepare Fire by placing crumpled paper in middle of firebox.  Do not use a grate, 
or  elevate fire.  Build fire directly on floor of firebox.

 

2.   Pull 

air control knob out fully for high

 (this is the small knob to the right of the 

door)

 

AIR CONTROL OUT = HIGH. 

 

AIR CONTROL KNOB IN = LOW

 

3.  Arrange dry kindling in 

tepee

” 

style with larger pieces standing up on each side. 

Ignite  paper leaving door ajar until kindling is alight.

 

4.      When  vigorous  flaming  of  the  kindling  subsides  and  embers  begin  to  appear,     
reload with larger wood, placing them in a side to side configuration.

 

5.   Open door carefully and place small pieces, then larger logs on top.     

 

6.   Close door tight and leave Air Control on HIGH for some 30 minutes.  The value in       
establishing this technique is that you are providing an excellent base for burning your 
wood effectively. 

 

7.  When  a  good  fire  is  established  move  air  control  to  middle  position.                                  

DO NOT IMMEDIATELY SHUT THE FIRE TO LOW.  

Remember to close the air con-

trol gradually to your desired level of heat output.  It is better to take 3

-

4    adjustments 

to get to the low  setting (extended burn).

 

RELOADING

 

WARNING: It is necessary to move the Air Control to HIGH before opening the 
door.

 

Never open the door when a vigorous fire is in progress.  Wait until the flames have        
subsided  and  the  wood  has  broken  up  into  glowing  embers.    Reload  with  dry  logs, 
placing them in a side to side configuration

 

Leave  the  air  control  in  the  HIGH  position  for  10  to  15  minutes  or  until  the  flames 
begin  to  subside.    This  shows  that  the  initial  highly  volatile  wood  gases  have  been 
driven off and the Fire will be able to maintain an even burning rate.

 

Normally a light load of fuel will stabilize quickly but a full load will take longer. Once 
the burning rate has stabilized move the Air Control to a medium position.

 

Содержание Topaz RURAL

Страница 1: ...e use of a NZ Home Heating Association solid fuel Fire installation technician SFAIT or other suitably qualified person The Fire and Flue System must be installed in accordance with AS NZS2918 All Ins...

Страница 2: ...t of Flue System Outlet 11 12 7 Typical Insulation Requirement 13 24 8 Clearances Floor Protector for a Zero Clearance Box Built In Fire Canopy 25 Installation of Kaowool ISB Insulation 26 Assembly In...

Страница 3: ...AEROSOLS in the vicinity of this FIRE when it is operating Use caution when reloading with fuel Do NOT attempt to load fuel into the Fire when the fire inside the stove is at or near its peak Do NOT b...

Страница 4: ...facturer should be consulted in the first instance Strict adherence to these instructions will meet these standards Any variation from these installation instructions or any doubt about them must be c...

Страница 5: ...heat sensitive materials in its construction it must meet the following MINIMIUM dimension as marked A B from Diagram above A 300mm from breast of fire to outer edge of concrete floor protector heart...

Страница 6: ...nt to check the condition of your masonry chimney Ensure any cracks are sealed loose masonry repaired and the chimney swept Check the dimensions of your fireplace opening are adequate to accept the ne...

Страница 7: ...and 10 6 Now that the Firebox and Flue are in position place 25mm white Kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire M...

Страница 8: ...The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue is extended over the chimney liner by 180mm Secure top spacer bracke...

Страница 9: ...Topaz RU Installation April 2019 9 6 INSERT FLUE SYSTEM FOR INSTALLATION IN A ZERO CLEARANCE BOX BOX Built in Fire Canopy...

Страница 10: ...f the floor protec tor 2 The flue cowl must be at least 600mm above the highest point of the roof if within 3 metres of it or 1 metre above the roof penetration if more than 3 metres from the ridge 3...

Страница 11: ...nstallation April 2019 11 7 TYPICAL INSULATION REQUIREMENTS FOR MASONRY Vent 50x100 minimum 450 Minimum Gap so Fascia fits is 300mm If lower than 150mm Insulated Hearth required If greater than 150mm...

Страница 12: ...nd masonry enclosure at the FRONT ONLY to a maximum depth of 80mm UNDER NO CIRCUMSTANCES SHOULD THE AIR SUPPLY INTO THE AIRPORTS ON THE SIDE OF THE FIRE BE RESTRICTED SIDE PILLAR CLEARANCE The minimum...

Страница 13: ...Built in Fire Canopy A ZERO CLEARANCE BOX Built in Fire Canopy IS REQUIRED IF THE FIRE IS NOT BEING INSTALLED INTO A MASONRY FIREPLACE For built in Zero Clearance Box Built in Fire Canopy installatio...

Страница 14: ...Topaz RU Installation April 2019 14 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 15: ...Topaz RU Installation April 2019 15 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 16: ...Topaz RU Installation April 2019 16 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 17: ...Topaz RU Installation April 2019 17 1350 1355 1000mm 1460 300 min 1000mm 300 min 700 min ZERO CLEARANCE BOX Built in Fire Cano...

Страница 18: ...Topaz RU Installation April 2019 18 700mm to Ceiling ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 19: ...Topaz RU Installation April 2019 19 1000 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 20: ...Topaz RU Installation April 2019 20 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 21: ...Topaz RU Installation April 2019 21 ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 22: ...learance to framing all round Zero clearance must sit on 40mm base provided Zero Flue starter must be used Minimum height to first framing 700mm The minimum height must be 300mm Minimum height to ceil...

Страница 23: ...of 20mm of Insulation board Promatech H Eterpan LD Pacbld Pro or product of similar thermal resistance and tiles slate or similar with sealed joints on top surface to protect from spilt ash embers FLO...

Страница 24: ...the clearance from the top of the fire box to the ceiling is no less than 1500mm The ash floor protector must be of a minimum of 450mm from the fire breast the width must be no less than 840mm Positio...

Страница 25: ...Topaz RU Installation April 2019 25 INSTALLATION OF KAOWOOL AND ISB INSULATION IN A ZERO CLEARANCE BOX Built in Fire Canopy...

Страница 26: ...EALAND BEING AN EARTHQUAKE PRONE COUNTRY IT IS IMPORTANT TO ANCHOR THE INSERT DOWN IN CASE OF MOVEMENT Restraint points are provided through the fires two front legs See diagram below 6 Install Flue a...

Страница 27: ...or carefully and place small pieces then larger logs on top 6 Close door tight and leave Air Control on HIGH for some 30 minutes The value in establishing this technique is that you are providing an e...

Страница 28: ...st empty Fire set at the same position Remember you only get out of any Fire what you put into it The better the fuel the better the Fire Do NOT burn plastic household refuse or driftwood This will vo...

Страница 29: ...d on the paintwork use Stovebright Metallic Black paint to retouch taking note of the manufacturer s instructions for spraying Never spray a hot fire FIRE BRICKS The internal fire bricks on the sides...

Страница 30: ...material for the glass should be replaced at this time also NEVER place glass directly against the door Without the insulation seal tape in place the glass is likely to shatter Your Firenzo Dealer wi...

Страница 31: ...arantees Act 1993 To the fullest extent permitted at law no other warranties or guarantees express or implied are assumed or given by Firenzo to any person with respect to the quality merchantability...

Страница 32: ...ered by the warranties or the entire Firenzo wood fire at its discretion where Firenzo is reasonably satisfied a defect is solely due to faulty Firenzo workmanship or materials 14 Firenzo may decline...

Страница 33: ...y questions about the warranties or this document please contact Firenzo at its specified address on telephone 06 8438260 by email at firenzo firenzo co nz or via the Firenzo website www firenzo co nz...

Страница 34: ...core Lady Kitchener Napier Viking Vision Insert Aqualux Athena Bay Flush Forte Bay Flush Kompact Athena Kompact Deco Kompact Diva Kompact Forte Kompact Plaza Kompact Serenity Topaz 98 Niven Street PO...

Отзывы: