Chapter 4: Configuring the FT-50 for Operation
4-5
Before You Begin
Before you begin configuring the FT-50, verify the following is
completed:
•
The inspection head is completely installed and is correctly
centered and leveled over conveyor chain as explained in
Chapter 3: Installing the FT-50
.
•
The rejector is completely installed and is aligned correctly
with the conveyor chain as explained in the rejector manual.
•
The takeaway conveyor is configured properly as explained in
the rejector manual.
•
All ramp actions position the containers properly on the
conveyor chain when they reach the inspection area.
•
Containers ride smoothly on the conveyor, do not slide, and
are not agitated when they reach the inspection area.
•
The rejector air pressure is stable and set at the correct
pressure.
•
All power cable wiring to the FT-50 and signal cable wiring to
the rejector, encoder, and any remote sensors are complete.
•
The Safety Interlock Switch is turned on. This switch must be
on in order to activate the Gamma Generator.
Industrial Dynamics Company, Ltd.
Document 40255-0600
Содержание FT-50c
Страница 1: ...FT 50c Service and Technical Reference Manual 40255 0600 ...
Страница 2: ...FT 50c Fill Level Inspector Service and Technical Reference Manual Document 40255 0600 ...
Страница 13: ...FT 50 Fill Level Inspector Service Manual XII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 19: ...FT 50 Fill Level Inspector Service Manual XVIII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 21: ...FT 50 Fill Level Inspector Service Manual 1 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 33: ...FT 50 Fill Level Inspector Service Manual 1 14 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 35: ...FT 50 Fill Level Inspector Service Manual 2 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 39: ...FT 50 Fill Level Inspector Service Manual 2 6 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 41: ...FT 50 Fill Level Inspector Service Manual 3 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 71: ...FT 50 Fill Level Inspector Service Manual 4 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 99: ...FT 50 Fill Level Inspector Service Manual 5 4 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 139: ...FT 50 Fill Level Inspector Service Manual 5 44 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 141: ...FT 50 Fill Level Inspector Service Manual 6 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 185: ...FT 50 Fill Level Inspector Service Manual 7 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 191: ...FT 50 Fill Level Inspector Service Manual 7 8 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 219: ...FT 50 Fill Level Inspector Service Manual 9 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 227: ...FT 50 Fill Level Inspector Service Manual 10 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 237: ...FT 50 Fill Level Inspector Service Manual 10 12 Industrial Dynamics Company Ltd Document 40255 0600 ...