![Filtec FT-50c Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/filtec/ft-50c/ft-50c_service-and-technical-reference-manual_2288783045.webp)
FT-50 Fill Level Inspector Service Manual
3-6
Determining the Proper Location for the FT-50
Before you begin installing your FT-50 Inspection System and
rejector you should understand all the requirements detailed in
Chapter 2: Installation Requirements
.
The location of the FT-50 within the production line is very
important. To achieve maximum performance from your FT-50, the
installation location must fulfill the following requirements. These
requirements are also detailed in installation drawing for the
rejector. Refer to the rejector manual for more information.
•
The FT-50 must be located far enough downstream from any
production event that will excessively agitate the contents of
the containers. Typically 3-5 seconds from a minor disturbance
such as brush off or curve, and 5-7 seconds from a major distur-
bance such as a seamer or sealer.
•
Containers must be centered on the conveyor prior to passing
through the inspection area. Upstream ramp actions may be
required to obtain proper positioning.
•
You will need at least 19 inches (49 cm) of space along the
conveyor in order to mount the FT-50 and rejector. You may
need more space for certain inspection options, ramp actions if
required, and reject conveyor requirements.
•
The conveyor section that passes through the inspection area
must be level and straight (no turns or curves).
•
The FT-50 can be installed on either the right side or left side of
the conveyor, however if you position it differently from the
orientation you specified when you placed the order, you may
need to reconfigure some add on sensors and triggers.
Industrial Dynamics Company, Ltd. Document 40255-0600
Содержание FT-50c
Страница 1: ...FT 50c Service and Technical Reference Manual 40255 0600 ...
Страница 2: ...FT 50c Fill Level Inspector Service and Technical Reference Manual Document 40255 0600 ...
Страница 13: ...FT 50 Fill Level Inspector Service Manual XII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 19: ...FT 50 Fill Level Inspector Service Manual XVIII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 21: ...FT 50 Fill Level Inspector Service Manual 1 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 33: ...FT 50 Fill Level Inspector Service Manual 1 14 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 35: ...FT 50 Fill Level Inspector Service Manual 2 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 39: ...FT 50 Fill Level Inspector Service Manual 2 6 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 41: ...FT 50 Fill Level Inspector Service Manual 3 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 71: ...FT 50 Fill Level Inspector Service Manual 4 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 99: ...FT 50 Fill Level Inspector Service Manual 5 4 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 139: ...FT 50 Fill Level Inspector Service Manual 5 44 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 141: ...FT 50 Fill Level Inspector Service Manual 6 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 185: ...FT 50 Fill Level Inspector Service Manual 7 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 191: ...FT 50 Fill Level Inspector Service Manual 7 8 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 219: ...FT 50 Fill Level Inspector Service Manual 9 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 227: ...FT 50 Fill Level Inspector Service Manual 10 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 237: ...FT 50 Fill Level Inspector Service Manual 10 12 Industrial Dynamics Company Ltd Document 40255 0600 ...