![Fike CyberCat 1016 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/fike/cybercat-1016/cybercat-1016_installation-manual_2288410006.webp)
TABLE OF CONTENTS
iv
CyberCat 254/1016 Installation Manual
UL S2203
Rev 14, 09/2015
P/N: 06-326
FM
SECTION
DESCRIPTION
PAGE
4.0
Installation ...................................................................................................................... 4-1
4.1
System Installation Sequence .......................................................................................... 4-1
4.2
Select the Enclosure Mounting Location.......................................................................... 4-1
4.3
Select the Enclosure Mounting Option............................................................................. 4-2
4.4
Mount the Enclosure ........................................................................................................ 4-2
4.4.1
Install the Dead-front Door ............................................................................................... 4-2
4.5
Wire Selection .................................................................................................................. 4-5
4.6
Circuit Class Designations ............................................................................................... 4-5
4.7
Pull Field Wiring Into the Enclosure ................................................................................. 4-5
4.8
Verify Field Wiring ............................................................................................................ 4-6
4.9
Install the AC Power Transformer .................................................................................... 4-6
4.10
Connect AC Power to the Transformer ............................................................................ 4-7
4.11
Install Optional Modules ................................................................................................... 4-9
4.12
Install the Controller ....................................................................................................... 4-10
4.13
Connect the AC Power to the Controller ........................................................................ 4-13
4.14
Install Batteries ............................................................................................................... 4-14
4.14.1
Battery Cutoff ................................................................................................................. 4-14
4.15
Apply Power to the Panel ............................................................................................... 4-15
4.16
Connect Field Wiring ...................................................................................................... 4-16
4.16.1
General Relay Wiring ..................................................................................................... 4-17
4.16.2
RS232 Wiring ................................................................................................................. 4-17
4.16.3
RS485 Peripheral Bus Wiring ........................................................................................ 4-17
4.16.4
Auxiliary Power Wiring ................................................................................................... 4-18
4.16.5
SLC Wiring ..................................................................................................................... 4-19
4.16.5.1
Class B Wiring ................................................................................................................ 4-19
4.16.5.2
Class A Wiring ................................................................................................................ 4-20
4.16.5.3
Class X Wiring ................................................................................................................ 4-20
4.16.5.4
Remote LED Wiring ....................................................................................................... 4-20
4.16.6
Notification Appliance Circuit Wiring .............................................................................. 4-21
4.17
Initial Power-Up with Field Wiring Connected ................................................................ 4-22
4.18
Configure System ........................................................................................................... 4-22
4.19
Acceptance Test ............................................................................................................ 4-22
Appendix A
Battery Calculation Form ............................................................................................. A-1
Appendix B
System Operation Posting ........................................................................................... B-1
Appendix C
Compatible Components ............................................................................................. C-1
Appendix D
Battery Cutoff ................................................................................................................ D-1