4. Commissioning
4−7
Festo P.BE−CPASC−EN en 0808c
The table below shows the effects of slow start−up pressuriza
tion when there are electric signals.
External pilot
air supply
Pressure
increase in
complete supply
Pressure
increase in the
pilot air (12/14)
Time point
when a valve
switches
Movement of
the actuator
branched after
the safety start−
up valve
slow
slow
after
pressure
increase at (1)
fast
branched in front
of the safety start−
up valve
slow
fast
before
pressure
increase at (1)
slow
Tab.4/1:
Effects of slow start−up pressurization
Содержание CPA-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPASC EN en 0808c...
Страница 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0808c Chapter 1...
Страница 41: ...Fitting 2 1 Festo P BE CPASC EN en 0808c Chapter 2...
Страница 55: ...Installation 3 1 Festo P BE CPASC EN en 0808c Chapter 3...
Страница 85: ...Commissioning 4 1 Festo P BE CPASC EN en 0808c Chapter 4...
Страница 102: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0808c...
Страница 103: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0808c Chapter 5...
Страница 116: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0808c...
Страница 117: ...Technical appendix A 1 Festo P BE CPASC EN en 0808c Appendix A...
Страница 133: ...Index B 1 Festo P BE CPASC EN en 0808c Appendix B...
Страница 134: ...B Index B 2 Festo P BE CPASC EN en 0808c Contents B Index B 1...