79
Figure 33 Transformer Rectifier Wiring to Control Cabinet
PRIMARY CABINET
SECONDARY CABINET
CO
M
REMOTE ACTIVATION INPUTS
SL
OWBL
O
RELAY
JP11
F1
JP14
600 OHM
20A
JP12
C4
CHARGER
JP20
RELA
Y
D2
CO
M
JP15
JP18
F5
F2
F1
F3
F4
F8
F6
F7
CO
M
SENSOR INPUTS
CO
M
#1
CO
M
SPR
CO
M
INTR
CO
M
AC
SOL
PT
T
600
CO
M
TEST
SPEAKER
JP29
JP19
JP17
JP16
DIR
-
SPR
#2
+
VISO
C1
NO
4
NO
3
C1
C2
C4
5A
1461132
YEL
WHT/YEL
YEL
GND
2005632
(SEE NOTE)
ORG
ORG
T300422-03-066
T300422-03-066
T300214-10-105
RED
RED
FROM BATTERY (+)
BATTERY CABINET
FIELD
WIRING
BLK
TB1-3
(GND
)
TB1
1 2 3 4 5
TB1-4
TB1-5
TB1-2
TB1-1
50Hz
60Hz
60Hz
50Hz
24Vdc
200Adc
45Uf
660V
+
-
100000Uf
35Vdc
AMP 5
SIG-
SIG+
BATTERY
(+)
JP25
SIG-
SIG+
BATTERY
(-)
AMP 6
JP26
2005147
(-)
Com
120V 60Hz
120V 50Hz
60Hz
50Hz
1
2
3
4
5
L1
N
210Vac
to
264Vac
FIELD
WIRING
NOTE:
FIELD WIRING SHOWN FOR 60Hz.
FOR 50Hz, CHANGE WIRING FROM TAP 2 TO TAP3
AND FROM TAP 4 TO TAP 5.
TAP
UVTR WIRING
1
2
NOTE
: Place 2005632A between fuse and contactor after connections are made.
Содержание ultravoice UV
Страница 42: ...42 Installation UltraVoice UV Figure 15 Omni Antenna Installation Example...
Страница 43: ...43 Installation Installation Operation and Service Manual Figure 16 Antenna Grounding...
Страница 71: ...71 Appendix C Drawings Figure 25 UV Controller Two way Radio Wiring Diagram...
Страница 72: ...72 Figure 26 UVTD IP Broadband Wiring Diagram...