![Fayat Group Dynapac CP2100 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/fayat-group/dynapac-cp2100/dynapac-cp2100_instruction-manual_4599058068.webp)
Parking
62
4812314580EN
2020-01-06
Long-term storage
For long-term storage (more than a month) follow
the instructions below:
These measures are valid for storage for a period of up to 6
months.
Before starting the machine again, the points stated below
shall be performed before parking and store the roller.
Wash the machine and touch up the painting finishing to
prevent rusting. Use anti-rust agents on the exposed parts
and lubricate carefully the machine, besides applying grease
to unpainted surfaces.
Engine
Refer to the manufacturer information in the engine instruction
manual supplied with the roller.
Battery
Remove the batteries from the roller, clean their outside parts
and recharge them once a month.
Air cleaner, exhaust pipe
Close the air tube (refer to the sections "Every 50 Hours of
Operation" and "Every 1,000 Hours of Operation") or the
respective intake opening with plastic or tape. Also cover the
exhaust pipe opening with sealing material to avoid moisture
entering in the engine.
Water distribution system
Drain all the water in the water tank and all the hoses. Also
drain the filter housing and the water pump and remove all the
sprinkler nozzles.
Refer to the Maintenance section to obtain further information
about water draining.
Fuel tank
Fill the fuel tank completely to prevent condensation.
Fig. - Roller weather protection
Содержание Dynapac CP2100
Страница 2: ......
Страница 3: ......
Страница 5: ......
Страница 6: ......
Страница 9: ...Introduction 2020 01 06 4812314580EN 3...
Страница 17: ...Technical specifications 2020 01 06 4812314580EN 11...
Страница 24: ...Safety decals description and location 18 4812314580EN 2020 01 06...
Страница 29: ...Instrument controls Description and function 2020 01 06 4812314580EN 23...
Страница 36: ...Instrument controls Description and function 30 4812314580EN 2020 01 06...
Страница 39: ...Instrument controls Description and function 2020 01 06 4812314580EN 33...
Страница 46: ...Emergency procedures 40 4812314580EN 2020 01 06...
Страница 50: ...Instruments controls Cab 44 4812314580EN 2020 01 06...
Страница 67: ...Operation 2020 01 06 4812314580EN 61...
Страница 75: ...Transport 2020 01 06 4812314580EN 69...
Страница 77: ...Operation instructions Overview 2020 01 06 4812314580EN 71...
Страница 79: ...Preventive maintenance 2020 01 06 4812314580EN 73...
Страница 91: ...Scheduled maintenance and lubrication 2020 01 06 4812314580EN 85...
Страница 106: ...Maintenance Every 50 hours 100 4812314580EN 2020 01 06...
Страница 129: ......