![Fayat Group BOMAG BW 213 D-5 Скачать руководство пользователя страница 143](http://html1.mh-extra.com/html/fayat-group/bomag-bw-213-d-5/bomag-bw-213-d-5_operating-instruction-maintenance-instruction_3690707143.webp)
8.3.3.2
Water quality
The correct quality of water is highly important
when preparing coolant. Clear and clean water
within the boundaries of the following analysis
values should generally be used.
Analysis values
pH-value at 20 °C
(68 °F)
6.5 - 8.5
Chlorine-ion content
max. 100 mg/l
Sulphate ion content
max. 100 mg/l
Water hardness (ion
content of calcium and
magnesium )
max. 3.56 mmol/l
max: 356 mg/l (ppm)
Germ degree:
max. 20 °dH
English degree:
max: 25 °eH
French degree:
max: 35.6 °fH
Bacteria, fungi, yeasts not permitted
Information concerning the water quality can be
obtained from the waterworks.
If the fresh water analysis values are unknown,
these must be determined with the help of a
water analysis.
If the values of the analysis deviate, the water
must be treated accordingly:
pH-value too low - Adding of caustic lye of
soda or caustic potash sol-
ution.
Water hardness
too high
- Mix with soft, distilled or
fully demineralized water
Chlorides and/or
sulphates too
high
- Mix with distilled or fully
demineralized water
Maintenance – Fuels and lubricants
BW 213 D-5
143
Содержание BOMAG BW 213 D-5
Страница 2: ...2...
Страница 9: ...1 Introduction Introduction BW 213 D 5 9...
Страница 14: ...Introduction Machine type plate and engine type plate BW 213 D 5 14...
Страница 15: ...2 Technical data Technical data BW 213 D 5 15...
Страница 20: ...Technical data Noise and vibration data BW 213 D 5 20...
Страница 21: ...3 Concerning your safety Concerning your safety BW 213 D 5 21...
Страница 62: ...Instruction sticker Always wear your seat belt Fig 12 Concerning your safety Signage BW 213 D 5 62...
Страница 63: ...4 Display and control elements Display and control elements BW 213 D 5 63...
Страница 82: ...Display and control elements Outside of machine BW 213 D 5 82...
Страница 83: ...5 Tests before taking into operation Tests before taking into operation BW 213 D 5 83...
Страница 95: ...6 Operation Operation BW 213 D 5 95...
Страница 124: ...Operation Emergency procedures BW 213 D 5 124...
Страница 125: ...7 Loading transporting the machine Loading transporting the machine BW 213 D 5 125...
Страница 133: ...8 Maintenance Maintenance BW 213 D 5 133...
Страница 207: ...9 Trouble shooting Trouble shooting BW 213 D 5 207...
Страница 217: ...10 Waste disposal Waste disposal BW 213 D 5 217...
Страница 219: ...11 List of special tools List of special tools BW 213 D 5 219...
Страница 220: ...Belt tension tester BOMAG No 079 947 09 Fig List of special tools BW 213 D 5 220...
Страница 221: ......
Страница 222: ......