19
Revision date: 01.14.21
112525
ASSEMBLE PUMP AND MAIN SUPPLY LINE
12
Assembly Instructions
110722
Utility Pump
Using the photos on this page and the notes that follow,
install the water pump and main supply line.
Read, understand, and follow these notes to construct the
main supply line and pump assembly:
• Fully insert all fittings into the 3/4" black hose during
assembly. See photo and note below.
• Secure all 3/4" black hose and fitting connections
using the 111698 ratchet clamps.
• Position the pump union assembly approximately 6"
above the reservoir cover. Secure with ratchet clamps.
• Position the filter/valve assembly at the reservoir end
of the frame between the crossbars as shown.
• Install filter assembly
according to the water flow
arrow on the filter housing
.
WF3411
ATTENTION:
Use pliers to gently squeeze ratchet
clamps around tubing.
6"
Pump Union
Assembly
WF1530
Elbow
Filter/V
alve
Assembly
WF4130
3/4" PVC
WF3411
WF2153
111074
WF6504A
3/4" Black Hose
WF6504A
3/4" Black Hose
Consult guide included with
the pump for pump fitting
installation.
111074
111698 Ratchet
Clamp
WF6504A
Black Hose
111698
Clamp
Pump Union
Assembly