15
Revision date: 01.14.21
112525
Complete these steps:
1. Cut a 28" piece of 3/4" pvc tube from a 10' section of WF4130 supplied with the system.
2. Slide a WF1530 elbow onto one end of the 28" pipe and a WF2990 cap onto the other end.
Do
not cement at this time.
8
Assembly Instructions
ASSEMBLE NUTRIENT SUPPLY MANIFOLD AND ATTACH TO FRAME
3. Move to the frame and snap the supply manifold into the 3/4" hangers. Install so elbow is at the
corner opposite the tee fitting of the drain manifold at the opposite end of the frame.
WF2990
WF1530
4. Verify the open end of the elbow points towards the opposite end of the frame and mark elbow
location on both the elbow and manifold tube for alignment purposes.
5. Continue with the next procedure.
TOP VIEW
DIAGRAM
(not to scale)
Elbow installed at
corner opposite the
tee fitting of the drain
manifold.
Mark for alignment.