17
Revision date: 01.14.21
112525
1. Once all gromets are installed, apply pvc primer and cement to each end of the pvc supply manifold and inside elbow and
cap and reinstall. Be sure to align the marks to install the elbow in the correct position.
FINISH MANIFOLD
10
Assembly Instructions
Apply primer and cement to both ends of the supply
manifold and inside fittings. Reinstall fittings.
WF6990 PVC
Cement & 113372
PVC Purple Primer
2. Allow cement to set and snap the assembled manifold back in the hangers.
IMPORTANT:
Assemble manifold by positioning top hat grommets down toward floor. Review sample picture below for a finished manifold with 1/4" feeder
tubes to NFT channels.
3. Continue with the next procedure.
Supply Manifold Installed
Cement
Cement
ATTENTION:
Actual system may differ.