Manual
KOMPAKTOMAT K1250PS | K1570PS
41
│
46
MAINTENANCE PLAN
Perform the planned maintenance according to the instructions
:
Maintenance Task
Daily
(season)
Once a
week
Before
season
After
season
Time
interval
Bolt connections
Visual inspection of bolt and hydraulic joints, tighten any
loose joints using a corresponding torque (see the torque
chart)
X
X
Towing lug – check, tighten if
needed
M16 - 10.9.
300 Nm
M20 - 10.9.
560 Nm
X
X
Wheels – tighten all wheel nuts.
First time: after 10 hours of operation
Wheel replacement: after 10 hours of operation
M 18 x 1.5
300 Nm
M 20 x 1.5
400 Nm
M 22 x 1.5
500 Nm
X
X
Brake system
Brake line and hoses – check the function, tightness,
mounting and clamping, or breaking
X
X
X
Brake components – check the function, tightness,
mounting
X
X
X
Air nozzle – drain using the draining valve
X
X
Draining valve – check the function, clean and replace
sealing
X
X
Pipe filter – clean
X
X
Brake/parking brake
–
check the function, escapement
setting 25-45mm
X
Brake lining – check the condition of the brake lining, min.
thickness of 3mm
X
Wheels/axle
Checking the tyre pressure
X
X
Transport axle
K500-1000PS
19.0/45-17 144 A8 pressure 350 kPa
19.0/45-17 148 A8 pressure 330 kPa
19.0/45-17 152 A8 pressure 390 kPa
19.0/45-17 157 A8 pressure 475 kPa
500/50-17 149 A8 pressure 300 kPa
500/50-17 154 A8 pressure 300 kPa
500/50-17 155 A8 pressure 300 kPa
Transport axle bearings – check and adjust allowance if
needed (in the workshop)
X