FTP9000 Series Programmable DC Power Supply Operation Manual
____________________________________________________________________________
- 36 -
Set
System
Edit
About
SEQ Step
1
File Length 100
V_Set
0.000 V
Cycle
1
I_Set
0.000 A
Link
0
Step-Time
86400.0 s
Figure 3-13 Sequence File Edit
4. Set “Length”, press
to validate it, the editing cursor will move to “Cycle” automatically;
5. Set “Cycle”, press
to validate it, the editing cursor will move to “Link” automatically;
6. Set “Link”, press
to validate it, the editing cursor will move to “SEQ Step” automatically;
7. Set “SEQ Step”, press
to validate it, the editing cursor will move to “V_Set” automatically;
8. Set “V_Set”, press
to validate it, the editing cursor will move to “I_Set” automatically;
9. Set “I_Set”, press
to validate it, the editing cursor will move to “Step-Time” automatically;
10. Set “Step-Time”, press
to validate it, the editing cursor will move to “SEQ step” automatically;
11. Repeat procedures of 7 ~ 11, till all sequence steps have been programmed.
12. Press
to save the programmed sequence file.
13. Press
to quit sequence editing.
-----------------------------------------------------------------------------------------------------------------------
When output is ON, sequence editing is not allowed
.
-----------------------------------------------------------------------------------------------------------------------