FIGURE 7
XEN-R000294 Rack Parts list
1. Front brackets (2)
2. Rear brackets 5-6 inch post (2)
3. Rear brackets 3-5 inch post (2)
4. Screw, 8-32 x 5/16-in., panhead Phillips (8)
5. Screw, 8-32 x 5/16-in., flathead Phillips (16)
6. Screw, 6-32 x 1/4-in., panhead Phillips (8)
7. Screw, 10-32 x 5/8-in., panhead Phillips (8)
8. Retainer nut, 10-32 (8)
Ensure that the items listed and illustrated in Figure are included in the kit. Note that not all parts may be used with certain installations
depending on the device type.
CAUTION
Use the screws specified in the procedure. Using longer screws can damage the
device.
Flush-front mounting
Observe the following notes when using this procedure:
•
The device must be turned off and disconnected from the fabric during this procedure.
•
The illustrations in this document show a 1U device, but the instructions are the same for a 2U device.
Installing the Universal Two-Post Rack Kit (XEN-R000294)
ExtremeSwitching SLX 9030 Hardware Installation Guide
9035691-02 Rev AD
33
Содержание EN-SLX-9030-48S-4C
Страница 6: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 6 9035691 02 Rev AD...
Страница 10: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 10 9035691 02 Rev AD...
Страница 64: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 64 9035691 02 Rev AD...
Страница 76: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 76 9035691 02 Rev AD...
Страница 82: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 82 9035691 02 Rev AD...
Страница 96: ...ExtremeSwitching SLX 9030 Hardware Installation Guide 96 9035691 02 Rev AD...