52
WT.025.200.000.DE.IM 0517
Maintenance
S10k
6.
6.5
Two-yearly maintenance
1
Replace the parts according to the maintenance parts kit
„Two-yearly“
2
Replace all flexible metal tubes even if they do not show corro-
sion.
Note
It is recommended to have a shedule fixed to all the flexible metal
tubes showing the date of the next replacement.
Содержание WALLACE & TIERNAN S10k
Страница 1: ...WALLACE TIERNAN GAS FEEDER S10k INSTRUCTION MANUAL ...
Страница 2: ...2 WT 025 200 000 DE IM 0517 S10k Please note Original manual ...
Страница 6: ...6 WT 025 200 000 DE IM 0517 Contents S10k ...
Страница 22: ...22 WT 025 200 000 DE IM 0517 Description S10k 3 ...
Страница 88: ...88 WT 025 200 000 DE IM 0517 Drawings S10k 7 7 4 Spare parts for the injectors 7 4 1 Injector W3T171367 1 ...
Страница 90: ...90 WT 025 200 000 DE IM 0517 Drawings S10k 7 7 4 2 Anti syphon injector W3T171368 1 ...
Страница 93: ...S10k Drawings 7 93 ...
Страница 94: ...94 WT 025 200 000 DE IM 0517 Drawings S10k 7 7 4 3 Injector W3T171369 3 4 ...
Страница 96: ...96 WT 025 200 000 DE IM 0517 Drawings S10k 7 7 4 4 Antisyphon Injektor W3T171370 3 4 ...
Страница 99: ...S10k Manufacturer declaration 8 99 8 Manufacturer declaration ...
Страница 100: ...100 WT 025 200 000 DE IM 0517 Manufacturer declaration S10k 8 ...