INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G e
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
22
CHECK INSTALLATION
DRIP PAN PROPERLY INSTALLED
15-16
Ensure that the drip pan half-rolled top bead overhangs
the cutout dimension by .25” and the black o-ring
is creating a seal against the countertop.
DRIP
PAN
GASKET
SECURED
16
Black drip pan gasket should fi t properly and create a
seal where the drip pan meets the chassis skirt.
INSTALL ELECTRICAL AND GAS CONNECTIONS
17-18, 21
Test unit for proper operation.
INSTALL COOK SURFACE PROPERLY
19-20
Cook surface support rails should be sitting on
chassis top with rear bullet secure in rear slot and
two front fasteners tightened so cook surface does
not
move.
PAGE #
Check to ensure the following items are complete:
INSTALLATION IS COMPLETE